Prismatic channel hydraulics (hydro/)
The free engine behind the Uniform Flow, Energy & Jump and Water Surface Profile tabs. It computes the geometry of rectangular, trapezoidal, triangular, circular, parabolic and surveyed (irregular) sections, uniform flow by Manning's equation, critical depth, specific energy and force, alternate and sequent depths, and gradually varied flow profiles (direct step), including a reach between two controls with a hydraulic jump.
Normal depth of a trapezoidal channel, Chow Example 6-2
Ven Te Chow, Open-Channel Hydraulics, McGraw-Hill, New York, 1959; Chapter 6 (computation of uniform flow), Example 6-2. Page number to be confirmed by the reviewer in the book.
Problem
A trapezoidal channel with a bottom width of 20 ft and side slopes of 2 horizontal to 1 vertical, lined so that Manning's n = 0.025, is laid on a slope of 0.0016 and carries 400 ft³/s. Find the normal depth.
Results
Reproduce in Flume
- Choose View ▸ US Customary Units (or, in the ribbon's Units group, the units menu ▸ “US customary: feet, ft³/s”). Changing units converts what is in the fields; the values below are typed in afterwards.
- In the channel panel on the left, under Section, click the “Trapezoidal” chip. Type Bottom width b = 20 ft, Left side slope z₁ = 2 H:1V, Right side slope z₂ = 2 H:1V.
- Under Roughness, type Manning's n = 0.025.
- Under Flow, type Discharge Q = 400 ft³/s, Bed slope S₀ = 0.0016 ft/ft, Energy coefficient α = 1 (α plays no part in the normal depth), and press Return.
- Open the Uniform Flow tab (⌘1). Under “Solve for” pick “Depth”.
- Read the bold result “Normal depth yₙ”: 3.361 ft. (The Flow group below repeats it as “Depth” 3.361 ft.)
- Checked by tests/verify/hydro-01-chow-6-2.script.
The published value is the book's answer, printed to two decimals (3.36 ft). Chow solves it by trial (section factor AR^(2/3) = nQ/(1.49√S)); Flume uses 1.486 for the Manning constant in US units, which can move the third decimal. The same channel is used again in Example 10-1 below.
Critical depth with α = 1.10 and the backwater curve behind a dam, Chow Example 10-1
Ven Te Chow, Open-Channel Hydraulics, McGraw-Hill, New York, 1959; Chapter 10 (methods of computing gradually varied flow), Example 10-1 and its table, on the channel of Example 6-2. Page and table number to be confirmed by the reviewer in the book.
Problem
The channel of Example 6-2 (b = 20 ft, z = 2, n = 0.025, S₀ = 0.0016, Q = 400 ft³/s) is taken with an energy coefficient α = 1.10. A dam backs the water up to a depth of 5 ft just behind it. Compute the backwater (M1) profile upstream from the dam to the point where the depth has fallen to 3.40 ft, just above the normal depth of 3.36 ft. The example also states the critical depth for α = 1.10.
Results
Reproduce in Flume
- Choose View ▸ US Customary Units. In the channel panel click “Trapezoidal” and type Bottom width b = 20 ft, Left side slope z₁ = 2, Right side slope z₂ = 2, Manning's n = 0.025, Discharge Q = 400 ft³/s, Bed slope S₀ = 0.0016 ft/ft and Energy coefficient α = 1.1; press Return.
- Critical depth: on the Uniform Flow tab (⌘1), with “Solve for” on “Depth”, the “Critical flow” group shows “Critical depth” 2.212 ft. The Energy & Jump tab (⌘2) shows the same 2.212 ft under “Critical flow”.
- Open the Water Surface Profile tab (⌘3). In the picker at the top choose “One Control”, then under Control section click the “Depth” chip.
- Type Control depth = 5 ft and Reach length = 0 ft (0 means: go on until within 1% of normal depth), and press Return.
- Under “Profile” read Profile = M1, Channel = Mild slope, Normal depth 3.361 ft, Critical depth 2.212 ft, Computed = Upstream, Length 2449.2 ft and Depth at the end 3.395 ft (“Within 1% of normal depth”: the end is below Chow's 3.40 ft).
- For Chow's length, scroll the table under the figure (columns Distance, Depth) to the bottom: the depth passes 3.40 ft between the last two rows, Distance 2298.41 / Depth 3.4080 and Distance 2449.23 / Depth 3.3946. Interpolating linearly gives about 2,388 ft to 3.40 ft. The screen does not show 2,354.1 ft (see the note).
- Checked by tests/verify/hydro-02-chow-10-1.script.
The critical depth 2.22 ft is printed in the example. The length “2,380 ft or so” is the value written in Flume's test source. It should be the last cumulative length in the example's table, which works in a few large depth steps, so it is approximate. The reviewer should read the exact figure from the book's table. Flume's 2,354.1 ft (the Flume column) is from the test: 200 steps, taking the farthest computed point whose depth is still ≥ 3.40 ft, not interpolated. The app computes the profile in 120 steps from 5 ft to within 1% of normal depth (Length 2449.2 ft, end depth 3.395 ft), so its table has different rows and no row at 3.40 ft; interpolating its two last rows (2298.41 ft at 3.4080 ft, 2449.23 ft at 3.3946 ft) gives ≈ 2,388 ft, +8 ft (+0.3%) from the published ≈ 2,380 ft. The difference between the test's 2,354.1 ft and the screen's ≈ 2,388 ft is the step count and the interpolation, not the method. Either way it is within the ±60 ft tolerance. Normal depth does not depend on α. The critical depth does: with α = 1 it is 2.148 ft (see Other checks).
Other checks (not from a publication)
- Rectangle b = 3 m, y = 1 m, n = 0.015: A = 3.0000 m², P = 5.0000 m, moment = 1.5000 m³ (exact). Q at S = 0.001 = 4.4992 m³/s against the hand value (1/0.015)·3·0.6^(2/3)·√0.001; normal depth for that Q gives back 1.0000 m.
- Rectangle, Q = 6 m³/s (q = 2 m²/s): critical depth 0.7416 m = (q²/g)^(1/3); Froude number 1.0000 there; minimum specific energy 1.1124 m = 1.5·y꜀.
- Jump from y₁ = 0.3 m in the same rectangle: sequent depth 1.5058 m = Bélanger's y₁/2·(√(1+8Fr₁²) − 1); sequent of the sequent gives back 0.3000 m; energy loss 0.9703 m = (y₂−y₁)³/(4y₁y₂); the alternate depth has the same specific energy (2.5660 m); solving for width gives back 3.0000 m.
- Chow's channel with α = 1: critical depth 2.1482 ft (2.148 expected, from Flume's own solution, not Chow, who uses α = 1.10).
- Chow's channel with α = 1, M1 profile from 5 ft at a dam to within 1% of normal depth: 2,496.66 ft against Flume's own reference value 2,497 ft (±5 ft); a reach limit of 1,000 ft stops it at 1,000.0000 ft.
- Profile classification on Chow's channel: control depths/slopes give M2 (L = 927.4 ft), M3 (80.0 ft), S1 (42.2 ft), S2 (89.4 ft), S3 (169.2 ft), H3 (75.1 ft), A3 (72.4 ft), H2 (reach 500 ft), C1 (100.6 ft), C3 (105.1 and 125.8 ft), A2 (400 ft): each named as expected.
- C1 profile: the water surface stays level (2.9812 ft + S꜀·50 ft against 3.0000 ft, ±0.02 ft). A2 profile deepens upstream (to 4.134 ft).
- Two controls on Chow's channel (gate 0.8 ft, weir 4.0 ft, 1,000 ft reach): a jump at 37.6 ft from 1.194 to 3.491 ft, M3 then M1. Force balance including the weight of the jump along the bed: 203.0122 = 203.0122. Jump length 15.8502 ft = 6.9·(y₂ − y₁). Depths at the gate (0.8000) and at the weir (4.0000) as set.
- Level-bed jump (rectangle, 0.3 m to 1.2 m, 200 m reach): the depths either side are sequent (1.3956 = 1.3956 m). On a steep bed (S = 0.05) the jump ends at 4.241 ft, above the level-bed sequent 3.379 ft, as expected. Deep tailwater drowns the jump; a shallow one on a steep slope sweeps it out.
- Structures: sharp-crested weir head 0.5000 m for Q = 0.62·(2/3)·√(2g)·3·0.5^1.5 = 1.9416 m³/s; ideal broad-crested weir head 1.0000 m for Q = 1.705·1·1^1.5; broad crest is critical (H = 1.5·y꜀ = 1.1124 m); gate jet depth 0.5·0.61 = 0.3050 m.
- Drowned sluice gate (Henderson's momentum formula, a formula, not a worked example): depth over the jet 0.9869 m = √(y₃² + 2q²/g·(1/y₃ − 1/yⱼ)); energy through the gate balances (3.2529 m); the drowned gate holds 3.233 m behind it, more than 2.534 m in free flow; a tailwater below the sequent depth does not drown it.
- α: the velocity head scales with α (0.3393 ft = 1.10 × the α = 1 value); Froude number is 1.0000 at the α = 1.10 critical depth; a divided section of two equal parts with velocities 2:1 gives α = 4/3 (1.3333).
- Circle D = 2 m half full: A = π/2, P = π, T = 2, moment = A·4r/(3π) (all exact); normal depth for the Q of y = 1.2 m gives back 1.2000 m; an overloaded pipe has no normal depth.
- Parabola T = 4 at y = 1: A = 8/3, T = 4, P = 2√2 + 2·asinh(1) = 4.5912 (exact).
- Chow's trapezoid surveyed as four points (irregular): area 89.7792, perimeter 35.0264, top width 33.4400, moment 138.1847 and normal depth 3.3610 ft, all the same as the trapezoid's.
- Divided section with n = 0.02 and 0.04 halves: equivalent n 0.0267 = 2/(1/0.02 + 1/0.04). A compound channel's discharge rises steadily with depth as it spills onto its flood plains.
Limits and open points for review
- Chow Example 10-1: the test's published length (2,380 ft) is written as approximate (“or so”) and checked to ±60 ft. Please confirm it, and the example and table numbers, against the book.
- Page numbers for Chow's examples 6-2 and 10-1 are not in the test source or the notes; please add them from the book.
- The app computes profiles in 120 steps and the test in 200, so the profile length on screen (2,449.2 ft to within 1% of normal) and the table rows differ slightly from the test's figures.
- Hydraulic jump length uses 6.9·(y₂ − y₁) (a rectangular-channel rule of thumb) for all shapes.
- Profiles are direct-step, from a single control depth; the jump between two controls on a sloping bed includes the weight of the jump along the bed.
Parameter studies and rating curves (studies/)Flume Pro
A Pro engine built on hydro/. It sweeps one input of a channel (discharge, depth, slope, n, bottom width or side slope) and tabulates chosen results for each value. It also builds stage–discharge ratings: computed by Manning's equation, or fitted to gaugings as Q = a·(h − h₀)^b by least squares on the logarithms, with an optional search for h₀ and Johnson's estimate of it.
Normal and critical depth in a discharge sweep, and a Manning rating, Chow Example 6-2
Ven Te Chow, Open-Channel Hydraulics, McGraw-Hill, New York, 1959; Example 6-2 (normal depth), with α = 1.10 and the critical depth as used in Example 10-1. Page numbers to be confirmed by the reviewer.
Problem
A trapezoidal channel, bottom width 20 ft, side slopes 2H:1V, n = 0.025, bed slope 0.0016, carries 400 ft³/s. Chow gives a normal depth of 3.36 ft and, with an energy coefficient α = 1.10, a critical depth of 2.22 ft. In Flume the channel is run as a discharge sweep (200, 400, 600, 800 ft³/s) and the 400 ft³/s row is compared; it is also run as a Manning rating (invert 100 ft, top 105 ft, every 0.1 ft), where the stage 103.36 ft must carry 400 ft³/s.
Results
Reproduce in Flume
- Choose View ▸ Studies (Pro), then View ▸ US Customary Units.
- In the channel panel on the left click the “Trapezoidal” chip and type Bottom width b = 20 ft, Left side slope z₁ = 2, Right side slope z₂ = 2, Manning's n = 0.025, Discharge Q = 400 ft³/s, Bed slope S₀ = 0.0016 ft/ft, Energy coefficient α = 1.1; press Return.
- In the picker at the top of the Studies pane choose “Parameter Study”. Under Vary click the “Q” chip, then the “List” picker, and type Discharge values (ft³/s) = 200, 400, 600, 800. Leave Results to tabulate as they come (Normal depth, Critical depth, Velocity, Froude, Energy, Area, Top width).
- In the table under the chart read the row Discharge 400.00 ft³/s: Normal depth 3.361 ft, Critical depth 2.212 ft (Velocity 4.454 ft/s). The Study group shows Rows 4.
- Choose “Rating Curve” in the picker at the top, then “Manning” under Rating from and “Fixed” under Zero-flow stage h0. Type Invert stage = 100 ft, Top stage = 105 ft, Interval = 0.1 ft.
- Under “At Q = 400.00 ft³/s” read Stage, Manning = 103.36 ft (Stage, rating equation 103.36 ft): Chow's normal depth above the invert carries Chow's discharge.
- For the discharge at 103.36 ft, scroll the table (Stage, Manning Q, Fitted Q, Difference) to the rows Stage 103.30 ft / Manning Q 387.04 ft³/s and 103.40 ft / 408.40 ft³/s; interpolating linearly at 103.36 ft gives 399.86 ft³/s.
- Checked by tests/verify/studies-01-chow-6-2.script.
Published values are the book's printed answers to two decimals. The rating check is the same problem turned round: Chow's depth must carry Chow's discharge. Flume interpolates linearly between the 0.1 ft stages, which accounts for part of the −0.14 ft³/s. On screen the Manning rating table is given at the 0.1 ft stages only; the app also shows the stage that carries the channel panel's 400 ft³/s directly (Stage, Manning 103.36 ft), which is the same check turned round once more.
Geometric elements of a circular section, Chow Appendix A
Ven Te Chow, Open-Channel Hydraulics, McGraw-Hill, New York, 1959; Appendix A, table of geometric elements for circular channel sections (A/D² and R/D against y/D). Page to be confirmed by the reviewer.
Problem
For a circular section of diameter D, the table gives the flow area as A/D² and the hydraulic radius as R/D for each relative depth y/D. Ten rows are checked, y/D = 0.1, 0.2 … 1.0, by a depth sweep of a pipe with D = 1 m (start 0.1 m, stop 1.0 m, 9 steps).
Results
Reproduce in Flume
- Choose View ▸ Studies (Pro); keep SI units (the ribbon's units menu shows “SI Units”).
- In the channel panel click the “Circular” chip and type Diameter D = 1 m, Manning's n = 0.013, Discharge Q = 0.5 m³/s, Bed slope S₀ = 0.001 m/m, Energy coefficient α = 1; press Return.
- In the Studies pane choose “Parameter Study”; under Vary click the “Depth” chip, then the “Range” picker, and type From = 0.1 m, To = 1.0 m, Steps = 9 (10 rows).
- Under Results to tabulate click Normal depth, Critical depth, Velocity, Froude, Energy and Top width to take them out of the table, and click Hyd. radius to put it in, leaving Area and Hyd. radius.
- The table under the chart has the columns Depth (m), Area (m²) and Hyd. radius (m). With D = 1 m the Area column is A/D² and the Hyd. radius column is R/D: they read 0.0409, 0.1118, 0.1982, 0.2934, 0.3927, 0.4920, 0.5872, 0.6736, 0.7445, 0.7854 and 0.0635, 0.1206, 0.1709, 0.2142, 0.2500, 0.2776, 0.2962, 0.3042, 0.2980, 0.2500 for depths 0.1000 to 1.0000 m, the same as Chow's table to four decimals.
- Checked by tests/verify/studies-02-chow-circle.script.
Published values are Chow's table, printed to four decimals. The test prints only the worst row of each column (0.0000 to four decimals, within 1e-4); the per-row Flume values above are from the same study call run outside the test so that each row could be shown. The app's table shows each row to four decimals, and every one equals the published value.
Rating curve fitted to ten gaugings, NPTEL Surface Water Hydrology Lecture 21
Rajib Maity, Surface Water Hydrology, NPTEL online course, IIT Kharagpur; Module 2, Lecture 21 (stage–discharge relationship), slides 17–19. Course URL to be added by the reviewer.
Problem
Ten stage–discharge gaugings of a stream are given, and the stage of zero flow is taken as a = 7 m. Fit Q = Cr·(h − a)^β by least squares on log Q against log(h − a), give the correlation coefficient, and estimate the discharge at a stage of 10 m.
Results
Reproduce in Flume
- Choose View ▸ Studies (Pro); keep SI units.
- Choose “Rating Curve” in the picker at the top of the Studies pane and “Gaugings” under Rating from. In the box “Stage (m), discharge (m³/s)” replace the text with the ten gaugings, one “stage, discharge” to a line: 7.2, 20 / 7.5, 110 / 7.8, 250 / 8.4, 510 / 8.9, 800 / 9.2, 1250 / 9.6, 1500 / 9.9, 2000 / 10.3, 2500 / 10.5, 2800.
- Under Zero-flow stage h0 choose “Fixed” and type h0 = 7 m. Under Rating table type From stage = 7 m, To stage = 10.5 m, Interval = 0.5 m, Look up stage = 10 m.
- Under Rating equation read Q = “320.6 (h − 7)^1.683”, Coefficient a 320.59, Zero-flow stage h0 7.000 m, Exponent b 1.6832, Correlation r 0.9982, Standard error 10.22 %, Points fitted 10 (and Johnson's estimate of h0 7.049 m, for information).
- Read the bold “Q at stage 10” = 2037.3 m³/s; the table under the chart shows the same in its row Stage 10.000 m, Discharge 2037.3 m³/s.
- Checked by tests/verify/studies-03-nptel-rating.script.
Published values are printed on the slides (β, Cr and r rounded as shown; Q(10 m) to the nearest m³/s). For comparison only: letting Flume search for h₀ instead of fixing it gives Q = 342 (h − 7.02296)^1.626, with a smaller log residual; this is not in the lecture.
Two-segment rating equation of station Khed, Hydrology Project SW-29
Hydrology Project (India), Training Module SW-29, How to establish stage discharge rating curve, 1999; Table 3.1, station Khed, 1997 data. URL to be added by the reviewer.
Problem
The module fits Khed's gaugings with two segments of q = c·(h + a)^b and lists the computed discharge for each gauging. Flume evaluates the published equations at two of the tabulated stages: the lower segment (a = −583.650 m, b = 1.074, c = 170.9) at h = 584.610 m and the upper segment (a = −581.964 m, b = 2.381, c = 14.01) at h = 589.750 m. This checks the evaluation of a given rating, not the fitting.
Results
Reproduce in Flume
- This check can't be entered in the app. The Rating Curve tool only fits an equation, to Manning's uniform flow or to gaugings; there is no field to type a published equation (coefficient, h₀, exponent) and evaluate it at a stage. The test calls the engine's RatingFit(a:, h0:, b:) and dischargeAt directly, and Khed's gaugings, which the screen could fit, are not in the test.
Published discharges are printed to three decimals in Table 3.1, but c is printed to only four significant figures, so evaluating the printed equation cannot match to more than about 0.1%; hence the ±0.2% tolerance. SW-29 writes (h + a) with a negative a; Flume's h₀ is −a.
Other checks (not from a publication)
- Every row of the Chow discharge sweep equals direct hydro calls (normal depth, velocity, specific energy, Froude), and normal depth rises with discharge.
- Velocity at Chow's normal depth: 4.4538 ft/s against the hand value 400/(20·3.36 + 2·3.36²) = 4.4554 ft/s (±0.02; the difference is 3.36 against 3.361).
- SI and US agree: the Chow channel in metres gives normal depth 1.0245 m (US × 0.3048 = 1.0244) and critical depth 0.6744 m (= 0.6744).
- Rectangle b = 3 m, Q = 6 m³/s: depth sweep gives Froude 1.0000 and specific energy 1.1124 m = 1.5·y꜀ at y꜀ = (q²/g)^(1/3); Froude by hand at 2y꜀ = 0.3536.
- Very wide channel (b = 1000 m): yₙ(2n)/yₙ(n) = 1.5161 against 2^0.6 = 1.5157 (±0.2%); yₙ(4S)/yₙ(S) = 0.6596 against 4^−0.3 = 0.6598; shear stress = γRS (2.5859 Pa); its Manning rating fits b = 1.6658 against 5/3 (±0.005).
- Side slope 0 gives the rectangle's normal depth (1.2314 m); normal depth falls as the bottom width grows; a flat slope gives an empty normal-depth cell and one warning.
- h₀ search on exact power-law data recovers h₀ = 2.0000, b = 1.6000, a = 125.0000 and r = 1; on the NPTEL data the search finds h₀ = 7.023 below the lowest stage and never does worse than h₀ = 7 m.
- Johnson's method (USGS TWRI 3-A10, Kennedy 1984, fig. 5, the formula only): e = 2.0000 on an exact power curve; no answer on a straight line.
- Rating tables: stages at an interval include both ends; the fitted table at 10.0 m and the Manning table at 102.5 ft (236.2390 ft³/s) equal the direct values; a pipe rating stops at the crown with a warning.
- Refusals instead of crashes: a width sweep of a pipe, a study with no outputs, n = 0, a fit with one point, h₀ above a gauging. CSV export: header, rows, empty cells, quoting, six significant digits.
Limits and open points for review
- The Khed check (SW-29) can only be run from the engine: the Studies tab has no way to enter a published rating equation.
- The Khed check evaluates the published equations; it does not refit Khed's gaugings (they are not in the test). Fitting a two-segment rating is left to the user (fit each stage range on its own).
- Fits minimise squared errors of log Q (the textbook and SW-29 method), so high flows weigh no more than low ones. One segment per fit; no loop ratings, backwater (fall) corrections or shifts.
- The h₀ search is one-dimensional over a bounded range; with noisy data the optimum can sit on the end of the range (a warning says so).
- Manning ratings assume uniform flow at one slope; computed ratings are interpolated linearly between stages.
- Please add page numbers (Chow Example 6-2 and Appendix A) and the URLs of the NPTEL slides and SW-29.
River reach by the standard step method (reach/)Flume Pro
A Pro engine for a reach of surveyed cross sections, in the manner of HEC-RAS. Each section is split at its bank stations and n break points into left overbank, channel and right overbank, each with its own conveyance. The water surface is carried from section to section by the energy equation, with friction from the average conveyance and contraction and expansion losses. It handles subcritical, supercritical and mixed regimes, and places hydraulic jumps where the specific forces balance.
Subdivided conveyance and stage for 175 ft³/s, ODOT Hydraulics Manual §8.11.1
Oregon Department of Transportation, Hydraulics Manual, April 2014; Chapter 8, §8.11.1 “Example Problem – Stage-Discharge Curve”, cross section A at Sta. 4+46, Figure 8-7 (tabular subdivided conveyance) and Figure 8-8 (stage–discharge curve). URL and page to be added by the reviewer.
Problem
Cross section A is surveyed as nine ground points. It is divided into a left overbank (n = 0.06) to station 40 ft, a main channel (n = 0.035) from 40 to 53 ft, and a right overbank (n = 0.05) beyond 53 ft. With a friction slope of 0.0027, Figure 8-7 tabulates the area, wetted perimeter and discharge Q = (1.486/n)·A·R^(2/3)·√S of each subsection at water surfaces 728.0, 729.0 and 730.0 ft (and higher). From the resulting stage–discharge curve, the stage for the design flow of 175 ft³/s is read as 730.81 ft.
Results
Reproduce in Flume
- Choose View ▸ River (Pro). In the ribbon's Units group open “SI Units” and choose “US customary: feet, ft³/s”. (A new file's River tab already holds a five-section reach whose downstream section RS 1 is ODOT's section A; the steps type its data in again.)
- In the picker at the top of the River pane choose “Sections” and click “RS 1” in the list of cross sections. Type River station = 446, Left bank station = 40 ft, Right bank station = 53 ft. Under Manning's n choose “Overbanks + channel” and type Left overbank n = 0.06, Channel n = 0.035, Right overbank n = 0.05.
- Under Ground points type the nine points, Station (ft) and Elevation (ft) on each row: 0, 733.5; 8, 731.2; 40, 730.81; 45, 727.0; 50, 727.0; 53, 730.61; 78, 729.4; 103, 731.0; 108, 734.0.
- Choose “Flow” in the picker. Type Discharge Q = 175 ft³/s, choose “Subcritical”, under Downstream boundary click the “Normal depth” chip and type Energy slope = 0.0027 ft/ft.
- Under “At RS 446” read the bold Water surface 730.82 ft (the table under the figure shows 730.819 in the WS column of row 446), and Flow left / channel / right 0 / 128.43 / 46.571 ft³/s.
- Choose “Rating” in the picker (At section RS 446). Type Lowest discharge = 25 ft³/s, Highest discharge = 250 ft³/s, Number of discharges = 10. Under Stage–discharge the 175.00 ft³/s row reads stage 730.819 ft.
- The subsection areas, wetted perimeters and discharges at 728.0, 729.0 and 730.0 ft (the first thirteen rows of the results table) can't be read in the app: the River tab takes the discharge as its input and shows the total flow area and top width and the flow split at the computed water surface, not each subsection's area and perimeter at a given level. Those rows are checked by the test only.
- Checked by tests/verify/reach-01-odot.script.
Figure 8-7 prints A, P and Q rounded to two figures. Several Flume values (728.0 channel area and perimeter, 730.0 right overbank area and discharge) fall outside that rounding (e.g. 6.07 against a printed 6.0), though inside the test's tolerance. The manual seems to have measured some values from its drawing: at 730.0 ft it uses a channel perimeter of 15 ft where the surveyed points give 13.9 ft. For that reason the 730.0 channel and total discharges get ±5%. The stage of 730.81 ft is read by eye from the curve in Figure 8-8; it happens to equal the left-bank elevation. The reviewer should check Figure 8-7 for any other subsection value that the test does not cover. On screen the stage is shown as 730.82 ft (two decimals) and 730.819 ft in the tables.
Normal depth of Chow's trapezoid entered as a surveyed section, Chow Example 6-2
Ven Te Chow, Open-Channel Hydraulics, McGraw-Hill, New York, 1959; Example 6-2. Page to be confirmed by the reviewer.
Problem
Chow's trapezoidal channel (b = 20 ft, 2H:1V sides, n = 0.025, S = 0.0016, Q = 400 ft³/s; normal depth 3.36 ft) is entered as four ground points, bed at elevation 100 ft and banks 8 ft high, with the whole section as main channel. The normal water surface less the bed elevation must be the published normal depth.
Results
Reproduce in Flume
- Choose View ▸ River (Pro). In the ribbon's Units group open “SI Units” and choose “US customary: feet, ft³/s”.
- In the picker at the top of the River pane choose “Sections”. Click the trash button “Delete this section” of the first section four times, so that only RS 1 is left, and click “RS 1”.
- Clear Left bank station and Right bank station (leave both empty: the whole section is channel). Under Manning's n choose “Overbanks + channel” and type Left overbank n = 0.025, Channel n = 0.025, Right overbank n = 0.025.
- Under Ground points click the trash button “Remove this point” five times, leaving four rows, and type Station, Elevation (ft): 0, 108; 16, 100; 36, 100; 52, 108.
- Click “Add Section”: a copy of RS 1 is put below it. Type its River station = 0. Click “RS 1” again and, under Reach to the next section, type Left overbank length = 100 ft, Channel length = 100 ft, Right overbank length = 100 ft. (A reach needs two sections; the normal-depth boundary is applied at the downstream one, RS 0.)
- Click “RS 0”, choose “Flow” in the picker, type Discharge Q = 400 ft³/s, choose “Subcritical”, click the “Normal depth” chip under Downstream boundary and type Energy slope = 0.0016 ft/ft.
- Under “At RS 0” read the bold Water surface 103.36 ft and Depth (from the lowest point) 3.361 ft; the table's WS column shows 103.361 for row 0.
- Checked by tests/verify/reach-02-chow-6-2.script.
Published value: the book's printed answer. The free Uniform Flow tab gives the same 3.361 ft for the trapezoid (see the hydro section).
Sequent depth of a jump in a trapezoidal channel, Iowa Stormwater Management Manual
Iowa Department of Natural Resources, Iowa Stormwater Management Manual, 2009; Section C15-S2, §G “Hydraulic jump design example for trapezoidal channel”. URL and page to be added by the reviewer.
Problem
A trapezoidal channel with a 10 ft bottom width and 1.5H:1V side slopes carries 200 ft³/s. The depth entering the jump is D₁ = 1.0 ft. Find the depth after the jump, D₂.
Results
Reproduce in Flume
- The River tab can't show this: it gives no sequent depth for a chosen depth (it places jumps only within a mixed-regime run between sections). The same jump is entered on the free Energy & Jump tab, which uses the hydro engine, not reach.
- Choose View ▸ US Customary Units. In the channel panel click “Trapezoidal” and type Bottom width b = 10 ft, Left side slope z₁ = 1.5, Right side slope z₂ = 1.5, Discharge Q = 200 ft³/s and Energy coefficient α = 1 (Manning's n and the bed slope are left as they are: they play no part); press Return.
- Open the Energy & Jump tab (⌘2). Under Depth of flow type Depth y = 1.0 ft and press Return.
- Under Hydraulic jump read the bold Sequent depth 3.664 ft (Depth before 1.000 ft, Depth after 3.664 ft).
- Checked by tests/verify/reach-03-iowa-jump.script.
The manual reads D₂ off a chart, so the published value is good to about ±0.1 ft, which is the tolerance used. The Flume column is the reach engine's sequent depth (from the test); the screen shows the hydro engine's on the Energy & Jump tab, 3.664 ft, the same value to three decimals.
Other checks (not from a publication)
- Chaudhry Example 6-2 channel (M. Hanif Chaudhry, Open-Channel Flow, 2nd ed., Springer, 2008, Example 6-2, p. 164): trapezoid b = 10 m, 2H:1V sides, n = 0.013, S₀ = 0.001, Q = 30 m³/s, α = 1, 5.0 m held at a downstream control (bed elevation 0). The standard step over 81 sections 50 m apart is compared with Flume's own direct-step engine (hydro, 2000 steps), not with the book. Water levels at 1 km: 5.0011 m (direct step 5.0011); 2 km: 5.0050 m (5.0050); 4 km: 5.2017 m (5.2021); ±2 mm; subcritical at all three. The book's Table 6-2 values were not available: the reviewer should compare these three levels with Table 6-2.
- Chow's trapezoid as four points: area 112.0000 ft², conveyance 13712.0871 and moment 202.6667 at WS 104 ft, and critical depth 2.1482 ft (α = 1), all equal to hydro's.
- ODOT section: the uniform-flow reach (normal-depth boundary) reproduces the normal WS downstream (730.5492 ft) and upstream (730.8192 ft); the flow split adds up to 175 ft³/s; α at WS 731.0 ft = 1.7561 equals HEC-RAS Hydraulic Reference Manual eq. 2-5 worked by hand, and is above 1.2 with overbank flow.
- Energy equation written out from the HEC-RAS Hydraulic Reference Manual (eqs. 2-1, 2-2, 2-3, 2-14 to 2-16) for a compound pair with different overbank and channel lengths, a flow change 150 → 175 ft³/s and a contraction: residual 0.0000; flow-weighted reach length 192.7603 ft; friction loss 0.1196 ft by average conveyance; EG = WS + αV²/2g (731.6435 ft).
- Near-frictionless widening and narrowing: expansion loss 0.0213 m = 0.3·Δhv; contraction loss 0.0069 m = 0.1·Δhv.
- Bélanger's equation (Chow eq. 3-20) in a 20 ft rectangle, 1000 ft³/s from 1.5 ft: 9.4562 ft, and back to 1.5000 ft; critical depth 4.2672 ft = (q²/g)^(1/3).
- Mild reach on Chow's channel, 5 ft at the downstream end: reaches normal depth 3.3610 ft 6000 ft upstream; depth 1000 ft upstream 3.9180 ft against the direct step's 3.9186 ft (±0.005); a normal-depth boundary gives uniform flow everywhere with Sf = 0.0016.
- Steep chute (S = 0.01, 20 ft rectangle, 1000 ft³/s) from critical depth (4.2672 ft): S2 profile, supercritical, reaches 2.9361 ft against normal depth 2.9270 ft 800 ft down (±0.02). A subcritical run on it falls back to critical depth with warnings.
- Mixed regime, gate 1.5 ft to tailwater 9 ft on a mild slope: one jump between sections 4 and 5 (2.123 → 9.370 ft), supercritical above, subcritical below; the sequent of the last supercritical depth is 9.4182 ft against 9.3703 ft (±0.4 ft, the change over one 10 ft spacing). Low tailwater: no jump; high tailwater (14 ft): drowned. Steep chute into a mild channel: the jump moves onto the chute and the end is at normal depth 8.2543 ft.
- SI and US runs agree: WS 2000 ft upstream 106.6562 against 106.6561 ft; critical WS 105.3482 ft both (±0.003 ft).
- n break points that repeat the three-value form give the same conveyance (4004.0442); a smoother break in an overbank carries more; water above the section ends gets vertical walls and a warning; bad inputs (one section, banks out of order, no discharge, no reach length, normal depth without slope) give a stated problem.
Limits and open points for review
- The River tab shows no subsection area or wetted perimeter at a given water surface, and no sequent depth for a chosen depth: the ODOT Figure 8-7 rows are checked by the test only, and the Iowa jump is reproduced on the Energy & Jump tab (hydro engine).
- Chaudhry Example 6-2 is a method-against-method check only; the book's Table 6-2 levels at 1, 2 and 4 km still need to be compared.
- ODOT Figure 8-7: some Flume values sit outside the two-figure rounding of the printed values, though inside the test's tolerances; the manual's own figures come partly from a scaled drawing.
- One reach only: no junctions, bridges, culverts, inline weirs, ineffective flow areas, levees, obstructions or lids; no split flow. Section ends are extended with vertical walls.
- Jumps are placed between two sections, not located exactly (as in HEC-RAS); the momentum check uses β = 1 and no weight or friction between sections, so accuracy depends on section spacing.
- The composite channel n is applied when any wet channel segment is steeper than 5H:1V (HEC-RAS tests only the channel side slopes). The critical WS is the least-energy level; of several minima the lowest wins.
Channel design (design/)Flume Pro
The Design tab (Pro) sizes channels and their protection. It covers best hydraulic sections, lined and erodible channels (permissible velocity and tractive force with Lane's K), and USBR canal freeboard. It also sizes riprap and gravel linings by HEC-15, gives composite and Cowan roughness, and designs USBR stilling basins Types I–IV after EM 25. All Flume numbers below are copied from the output of tessel run tests/design_test.tsl (all checks passed, 2026-10-30).
Best hydraulic sections, Chow Table 7-1
Ven Te Chow, Open-Channel Hydraulics, McGraw-Hill, New York, 1959; ch. 7, Table 7-1 "Best hydraulic sections" (p. 160 in the 1959 printing; page not checked against the book).
Problem
Chow's table gives the area A, wetted perimeter P, hydraulic radius R, top width T and hydraulic depth D of the best section of each shape as multiples of the depth y. Flume builds each best shape at y = 2 and divides its properties by y² or y. The parabola is checked only for A, T and D, because Chow's P for it is an approximation (P ≈ T + 8y²/3T) and Flume uses the exact perimeter.
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- In the ribbon’s Units group, open SI Units and choose US customary: feet, ft³/s.
- Click the Best Section tool, then the Trapezoid shape. Leave Side slope z (empty: best) empty; type Discharge Q 400 ft³/s, Bed slope S₀ 0.0016, Manning’s n 0.025. (The test checks the shapes at a set depth through an internal call; the screen solves the depth from Q, so the ratios are read by dividing by the depth.)
- Under SECTION read: Depth y 6.615 ft, Side slope z 0.5774 (= 1/√3), Top width T 15.276 ft (T/y = 2.309), Flow area A 75.787 ft² (A/y² = 1.732), Wetted perimeter P 22.914 ft (P/y = 3.464), R/y 0.5000; D = A/T = 4.961 ft (D/y = 0.750).
- Click Rectangle: Depth y 6.267 ft, Bottom width b and Top width T 12.535 ft (2y), Flow area A 78.562 ft² (2y²), Wetted perimeter P 25.070 ft (4y), R/y 0.5000; D = A/T = y.
- Click Triangle: Depth y 8.864 ft, Side slope z 1.0000, Top width T 17.727 ft (2y), Flow area A 78.562 ft² (y²), Wetted perimeter P 25.070 ft (2√2·y), R/y 0.3536 (√2/4); D = y/2.
- Click Semicircle: Depth y 6.862 ft, Diameter D and Top width T 13.723 ft (2y), Flow area A 73.958 ft² (A/y² = 1.571), Wetted perimeter P 21.557 ft (P/y = 3.142), R/y 0.5000; A/T = 5.389 ft (D/y = 0.785).
- Click Parabola: Depth y 6.332 ft, Top width T 17.908 ft (T/y = 2.828), Flow area A 75.591 ft² (A/y² = 1.885); A/T = 4.221 ft (D/y = 0.667). (R/y shows 0.5244 because Flume uses the exact arc length for P; Chow’s P is not compared.)
- Checked by tests/verify/design-01-best-sections.script.
Published values are Chow's closed-form expressions (printed in the table as multiples of y); the decimals are their exact values. Chow's parabola perimeter (8/3)√2·y is an approximation and is not compared; Flume uses the exact parabola arc length. On screen the shapes are found from a discharge (400 ft³/s here) rather than at a set depth, so the ratios in the table are the screen values divided by the depth shown; with the screen’s 4–5 significant figures they agree with the table to the 4th digit.
Lined trapezoidal canal, Ponce Example 6-2
Victor M. Ponce, Fundamentals of Open-Channel Hydraulics, online edition, San Diego State University, 2014; Chapter 6 "Channel Design", §6.1 Nonerodible Channels, Example 6-2. https://ponce.sdsu.edu/openchannel/open_channel_hydraulics_06.php
Problem
Find the normal depth, velocity and Froude number of a lined trapezoidal channel with Q = 10 m³/s, bottom width b = 5 m, side slope z = 2, bottom slope S = 0.0016 and Manning n = 0.025.
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- Keep the units at SI Units (the setting of a new channel).
- Click the Lined tool. Type Discharge Q 10 m³/s, Bed slope S₀ 0.0016, Manning’s n 0.025, Side slope z 2. Under BOTTOM WIDTH click Given and type Bottom width b 5 m.
- Under CHANNEL read Normal depth y 1.049 m, Flow area A 7.449 m² and Top width T 9.197 m (D = A/T = 0.810 m); under FLOW read Velocity 1.342 m/s and Froude number 0.476.
- Checked by tests/verify/design-02-ponce-6-2.script.
Ponce's text gives two Froude numbers: F = 0.418 in the hand solution and 0.476 from his online calculator, which uses the hydraulic depth D = 0.81 m. 0.418 = vn/√(g·yn) uses the flow depth instead of D; 0.476 = vn/√(g·D) is the correct one for a trapezoid, and Flume matches it. The example also assumes a freeboard of 0.6 m, which is not compared (Flume uses the USBR freeboard below).
Canal do Trabalhador, Ponce §6.1 (Fig. 6-14)
Victor M. Ponce, Fundamentals of Open-Channel Hydraulics, online edition, 2014; Chapter 6, §6.1, the Canal do Trabalhador (Ceará, Brazil, 1993), Fig. 6-14. https://ponce.sdsu.edu/openchannel/open_channel_hydraulics_06.php
Problem
Normal flow in the lined Canal do Trabalhador: Q = 8.32 m³/s, b = 5 m, z = 1.5, S = 0.00005, n = 0.015. The test also sets a minimum velocity of 0.75 m/s (Flume's suggested value) and expects a silting warning.
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- Keep the units at SI Units (the setting of a new channel).
- Click the Lined tool. Type Discharge Q 8.32 m³/s, Bed slope S₀ 0.00005, Manning’s n 0.015, Side slope z 1.5. Under BOTTOM WIDTH click Given, type Bottom width b 5 m; under CHECKS type Least velocity 0.75 m/s.
- Read Normal depth y 1.915 m, Velocity 0.5518 m/s and Froude number 0.149. Below the results the warning “The velocity 0.55 is below the minimum 0.75: silt and weeds may settle” is shown.
- Checked by tests/verify/design-03-trabalhador.script.
Values printed in Ponce's text. The silting warning is Flume's own check against the 0.75 m/s minimum, not a statement from Ponce.
Canal bank freeboard, USBR Design of Small Canal Structures §2-6 (Fig. 1-9)
USBR (Aisenbrey, A.J., Jr., Hayes, R.B., Warren, H.J., Winsett, D.L., Young, R.B.), Design of Small Canal Structures, U.S. Bureau of Reclamation, Denver, 1978; §2-6 inverted siphon design example (freeboard of a 15 ft³/s earth canal) and Fig. 1-9 (freeboard and height of bank and lining vs capacity).
Problem
In the siphon design example the upstream canal carries 15 ft³/s at a depth of 1.25 ft, and its normal bank freeboard is read from Fig. 1-9 as 1.3 ft. The test also reads the hard-surface lining height above the water at small flows from the same figure (0.5 ft).
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- In the ribbon’s Units group, open SI Units and choose US customary: feet, ft³/s.
- Click the Freeboard tool. Type Discharge Q 15 ft³/s and Depth of flow y 1.25 ft.
- Under USBR FIG. 1-9 read Bank above water 1.240 ft and Hard lining above water 0.5000 ft (Earth lining above water 0.5000 ft); under USBR FORMULA, C 1.5000 and Freeboard F 1.369 ft.
- Checked by tests/verify/design-04-usbr-freeboard.script.
Both published values are read off a chart: 1.3 ft is the example's reading of Fig. 1-9, and Flume's curve is itself digitized from a render of Fig. 1-9 (log scale of Q, 10–20,000 ft³/s). Two chart readings differ by 0.06 ft here; the ±0.1 ft tolerance reflects chart-reading precision. The reviewer may check Fig. 1-9 at 15 ft³/s in the book. The section numbers (§2-6, Fig. 1-9) are from the test comment and were not checked against the book.
Composite lining roughness, HEC-15 §3.3 example (SI)
Kilgore, R.T., and Cotton, G.K., Design of Roadside Channels with Flexible Linings, Hydraulic Engineering Circular No. 15 (HEC-15), 3rd ed., FHWA-IP-05-114, Federal Highway Administration, 2005; §3.3 composite lining design example (SI), Eq. 3.5 (Horton–Einstein).
Problem
A trapezoidal channel (bottom width 0.9 m, side slopes 3H:1V, S = 0.02) has a concrete low-flow channel along the bottom (PL = 0.9 m, nL = 0.013) and vegetation on the sides. The effective n is found by Eq. 3.5 by trial. First trial: total P = 2.80 m with side n = 0.043 → ne = 0.035. Second trial: depth 0.19 m, P = 2.10 m, side n = 0.052 → ne = 0.038, giving Q = 0.27 m³/s.
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- Keep the units at SI Units (the setting of a new channel).
- Click the Roughness tool, Composite n, Table of parts. Remove the third part with its trash button; in the first row type P 0.9 and n 0.013, in the second P 1.9 and n 0.043 (leave A and y empty). Read Horton–Einstein 0.0349 under EQUIVALENT N (trial 1).
- Click Bed and sides; type Bottom width b 0.9 m, Side slope z 3, Depth y 0.19 m, n of the bed 0.013, n of the sides 0.052. Read PARTS Each side: P 0.6008 m and Horton–Einstein 0.0380 (trial 2).
- Click the Uniform Flow tab. In the channel panel click Trapezoidal, type Bottom width b 0.9 m, Left side slope z₁ 3, Right side slope z₂ 3, Manning’s n 0.0380, Bed slope S₀ 0.02. Under SOLVE FOR pick Q and type Depth y 0.19 m. Read Discharge Q 0.2707 m³/s (and Wetted perimeter 2.102 m).
- Checked by tests/verify/design-05-hec15-composite.script.
Values printed in the HEC-15 example. In trial 2 the bed/side perimeters come from Flume's own trapezoid split (bed 0.9 m, each side 0.19·√10 = 0.60 m, P = 2.10 m), which matches HEC-15's P = 2.10 m. On screen the discharge reads 0.2707 m³/s, not the test’s 0.2705: the screen uses n typed as 0.0380, the test the unrounded ne.
Composite and Cowan n of natural channels, USGS WSP 2339 Table 4 (sections 1–3)
Arcement, G.J., Jr., and Schneider, V.R., Guide for Selecting Manning's Roughness Coefficients for Natural Channels and Flood Plains, U.S. Geological Survey Water-Supply Paper 2339, 1989; Table 1 (base values), Table 2 (adjustment factors) and Table 4 (example computation of n for cross sections 1–3). https://pubs.usgs.gov/wsp/2339/report.pdf
Problem
Table 4 works Cowan's formula n = (n_b + n₁ + n₂ + n₃ + n₄)·m for three cross sections. Section 1: n_b = 0.025, vegetation n₄ = 0.005 → 0.030. Section 2: a bed of 15 ft bedrock (n 0.040), 25 ft sand (0.025) and 25 ft gravel (0.030), weighted by wetted perimeter → n_b = 0.030; plus irregularity 0.002 and obstructions 0.002 → 0.034. Section 3: main channel n_b = 0.025 + obstructions 0.003 → 0.028; cotton-field flood plain n_b = 0.025 + irregularity 0.010 + vegetation 0.040 → 0.075. Table 2 gives 0.050–0.100 for "very large" vegetation.
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- In the ribbon’s Units group, open SI Units and choose US customary: feet, ft³/s.
- Click the Roughness tool, Composite n, Table of parts. Type the three rows: P 15, n 0.040; P 25, n 0.025; P 25, n 0.030 (A and y empty). Read Perimeter-weighted 0.0304 under EQUIVALENT N.
- Click Cowan. Section 1: type Base n_b 0.025, Irregularity n₁ 0, Section variation n₂ 0, Obstructions n₃ 0, Vegetation n₄ 0.005, Meander m 1; read Manning’s n 0.0300 under COWAN’S N.
- Section 2: Base n_b 0.030 (the paper’s rounded value), n₁ 0.002, n₂ 0, n₃ 0.002, n₄ 0, m 1; read Manning’s n 0.0340.
- Section 3, main channel: Base n_b 0.025, n₁ 0, n₂ 0, n₃ 0.003, n₄ 0, m 1; read Manning’s n 0.0280.
- Section 3, cotton field: Base n_b 0.025, n₁ 0.010, n₂ 0, n₃ 0, n₄ 0.040, m 1; read Manning’s n 0.0750.
- Click the list button beside Vegetation n₄ (“Conditions (WSP 2339)”): the row Very large shows 0.05–0.1.
- Checked by tests/verify/design-06-wsp2339.script.
Values printed in Table 4 (and Table 2). The exact weighted mean is (15·0.040 + 25·0.025 + 25·0.030)/65 = 0.0304; the USGS table rounds it to 0.030. The test feeds Flume's unrounded 0.0304 into section 2's Cowan sum, so Flume gives 0.0344 where the paper (using 0.030) gives 0.034; with the paper's rounded base the sum is exactly 0.034. Reviewer may confirm the Table 4 entries in the PDF. In the app the steps type the paper’s rounded n_b = 0.030 for section 2, so the screen shows 0.0340 (the paper’s value) where the test’s Flume column shows 0.0344. The vegetation list shows the “Very large” range as 0.05–0.1 (trailing zeros dropped).
Tractive-force design, Ponce §6.4 worked example A (sides govern)
Victor M. Ponce, Fundamentals of Open-Channel Hydraulics, online edition, 2014; Chapter 6, §6.4 Permissible Tractive Force, worked example A (after Chow 1959, ch. 7, Figs. 7-7 to 7-10). https://ponce.sdsu.edu/openchannel/open_channel_hydraulics_06.php
Problem
Design an unlined trapezoidal channel in slightly angular material (d25 = 0.7 in, angle of repose 34°) for Q = 600 ft³/s, z = 2, S = 0.001, n = 0.022. Lane's K for z = 2 and 34° is 0.6; the permissible stress τL = 0.28 lb/ft² (Chow's chart), so the sides allow τs = 0.6·0.28 = 0.168 lb/ft². With the side-stress factor C_s = 0.78 (Chow's chart), y ≤ 3.45 ft. Ponce takes b/y = 10 → b = 35 ft (rounded from 34.5), which gives yn = 3.376 ft and a bottom stress of 0.211 lb/ft² (below 0.28: stable).
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- In the ribbon’s Units group, open SI Units and choose US customary: feet, ft³/s.
- Click the Erodible tool, Tractive force, and under MATERIAL Enter τ. Type Discharge Q 600 ft³/s, Bed slope S₀ 0.001, Manning’s n 0.022, Side slope z 2; leave Bottom width (empty: design) empty. Type Permissible τ 0.28 lb/ft², leave Bottom τ (empty: same) empty, type Angle of repose φ 34 and Side factor C_s 0.78; leave Bottom factor C_b empty.
- Under LIMITS read Lane’s K 0.600, Allowed on the sides K·τ 0.1681 lb/ft², Deepest flow allowed 3.454 ft and Governed by “The sides”; under CHANNEL, Bottom width b 33.540 ft.
- Type Bottom width 35 ft (a check). Read Normal depth y 3.376 ft, STRESSES On the bottom 0.2107 lb/ft², and Channel is “Stable”.
- Checked by tests/verify/design-07-tractive-a.script.
τL = 0.28 lb/ft² and C_s = 0.78 are chart readings in Ponce/Chow (Chow Figs. 7-9/7-10 and 7-7); Flume takes them as inputs. Flume's design width (33.5 ft) carries Q exactly at y = 3.45 ft; Ponce does not solve for this width but picks b/y = 10, so 33.5 vs 35 is not a disagreement. The design-width row checks only that it lies between the failing 21 ft and Ponce's 35 ft. The screen shows the design width as 33.540 ft and the deepest flow as 3.454 ft (four significant figures of the test’s 3.4536).
Tractive-force design, Ponce §6.4 worked example B (bottom governs)
Victor M. Ponce, Fundamentals of Open-Channel Hydraulics, online edition, 2014; Chapter 6, §6.4, worked example B. https://ponce.sdsu.edu/openchannel/open_channel_hydraulics_06.php
Problem
As example A, but the bottom is fine material (d60 = 0.8 mm, high fine-sediment content) with permissible stress 0.09 lb/ft²; the sides keep 0.28 lb/ft². The bottom then governs: Ponce finds y = 1.44 ft and finally b = 152 ft.
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- In the ribbon’s Units group, open SI Units and choose US customary: feet, ft³/s.
- Click the Erodible tool, Tractive force, Enter τ, and type the example A values (Q 600 ft³/s, S₀ 0.001, n 0.022, z 2, bottom width empty, Permissible τ 0.28 lb/ft², Angle of repose φ 34, Side factor C_s 0.78, C_b empty), then Bottom τ (empty: same) 0.09 lb/ft².
- Read LIMITS Deepest flow allowed 1.442 ft and Governed by “The bottom”; CHANNEL Bottom width b 152.01 ft and Normal depth y 1.442 ft.
- Checked by tests/verify/design-08-tractive-b.script.
Ponce gives two widths: step 19 gives b = 154 ft (b/y = 106) and step 20 recomputes with b = 152 ft ("Design now OK!"). The test uses the final 152 ft; the ±3 ft tolerance covers both. Flume lands on 152.0 ft.
Riprap channel lining, HEC-15 §6.3.1 / §6.3.2 design example (SI)
Kilgore, R.T., and Cotton, G.K., Design of Roadside Channels with Flexible Linings, HEC-15, 3rd ed., FHWA-IP-05-114, FHWA, 2005; ch. 6, §6.3.1 riprap design example (SI) and §6.3.2 side slope example; Table 6.1, Eqs. 3.4, 6.8, 6.15.
Problem
Check a trial riprap lining of D50 = 125 mm (Class 1) in a trapezoidal channel: Q = 1.13 m³/s, B = 0.6 m, Z = 3, S = 0.02, γs = 25,900 N/m³. HEC-15 finds d = 0.521 m, n = 0.061, Re = 3.5×10⁴, so F* = 0.047 and SF = 1.0 from Table 6.1, and a required D50 = 0.135 m: Class 1 is too small and Class 2 (150 mm) is used. The side slope check (§6.3.2) with repose 38° gives K1 = 0.87, K2 = 0.86 and side D50 = 0.137 m.
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- Keep the units at SI Units (the setting of a new channel).
- Click the Riprap tool. Type Discharge Q 1.13 m³/s, Bottom width B 0.6 m, Side slope Z 3, Bed slope S 0.02; under STONE, Trial D50 0.125 m, Unit weight γs 25900 N/m³, Angle of repose 38; leave Safety factor empty (Table 6.1).
- Under FLOW read Depth d 0.5200 m and Manning’s n (Blodgett) 0.0614; under STONE, Particle Reynolds number 35297.1, Shields’ parameter F* 0.0470, Safety factor 1.000, K₁ 0.868, K₂ 0.858; under D50 NEEDED, Bottom 0.1349 m and Sides 0.1365 m; last row “Trial D50 0.1250 m is Too small”.
- Type Trial D50 0.150 m: the last row reads “Trial D50 0.1500 m is Stable”.
- Checked by tests/verify/design-09-riprap-si.script.
Values printed in the HEC-15 example; Table 6.1 values (F*, SF) are table entries, not chart readings. HEC-15 rounds K1 to 0.87; the test checks Flume against the unrounded 0.868 from Eq. 3.4. HEC-15 uses g = 9.81 m/s²; Flume uses 9.80665, which accounts for part of the small differences. In check mode with D50 = 0.150 m the screen also shows the bottom and side needs recomputed with that stone’s own n (0.1357 and 0.1372 m), both below 0.150.
Riprap channel lining, HEC-15 §6.3.1 / §6.3.2 design example (CU)
Kilgore, R.T., and Cotton, G.K., HEC-15, 3rd ed., FHWA-IP-05-114, FHWA, 2005; ch. 6, §6.3.1 and §6.3.2 design examples, customary-unit (CU) version.
Problem
The same example in customary units: Q = 40 ft³/s, B = 2 ft, Z = 3, S = 0.02, trial D50 = 5 in, γs = 165 lb/ft³, repose 38°. HEC-15 gives d = 1.72 ft, n = 0.062, required bottom D50 = 0.45 ft and side D50 = 5.46 in.
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- In the ribbon’s Units group, open SI Units and choose US customary: feet, ft³/s.
- Click the Riprap tool. Type Discharge Q 40 ft³/s, Bottom width B 2 ft, Side slope Z 3, Bed slope S 0.02, Trial D50 0.4167 ft (5 in; the field is in feet), Unit weight γs 165 lb/ft³, Angle of repose 38; leave Safety factor empty.
- Read Depth d 1.710 ft, Manning’s n (Blodgett) 0.0619, D50 NEEDED Bottom 0.4425 ft and Sides 0.4477 ft (× 12 = 5.37 in).
- Checked by tests/verify/design-10-riprap-cu.script.
Values printed in the HEC-15 CU example. The CU differences (≈1.6–1.7% on D50) are larger than in SI. The CU example is a rounded conversion of the SI one (1.13 m³/s ≈ 40 ft³/s, 0.6 m ≈ 2 ft), and HEC-15 rounds intermediate values, so this size of difference is expected; the D50 tolerances (±0.01 ft, ±0.12 in) are set to cover it. Reviewer may check the CU intermediate values in the book. The app’s D50 field is in feet in US units, so 5 in is typed as 0.4167 ft and the side D50 is read in feet (0.4477 ft = 5.37 in).
Gravel mulch lining, HEC-15 §3.1 basic channel example (SI)
Kilgore, R.T., and Cotton, G.K., HEC-15, 3rd ed., FHWA-IP-05-114, FHWA, 2005; ch. 3, §3.1 design example (basic channel, gravel mulch, SI).
Problem
Check a gravel mulch lining (D50 = 25 mm) in a trapezoidal channel with Q = 0.42 m³/s, B = 0.4 m, Z = 3, S = 0.008. HEC-15 finds d = 0.344 m, n = 0.035, design shear τd = 27 N/m² and permissible shear τp = 19 N/m²: the lining is not stable.
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- Keep the units at SI Units (the setting of a new channel).
- Click the Riprap tool. Type Discharge Q 0.42 m³/s, Bottom width B 0.4 m, Side slope Z 3, Bed slope S 0.008, Trial D50 0.025 m; leave Unit weight γs, Angle of repose and Safety factor empty (defaults).
- Read Depth d 0.3447 m, Manning’s n (Blodgett) 0.0350, Bottom shear τd = γdS 27.048 N/m², Permissible τp of the trial 18.906 N/m², and “Trial D50 0.0250 m is Too small”.
- Checked by tests/verify/design-11-gravel-mulch.script.
Values printed in the HEC-15 example. The test leaves γs and the repose angle at Flume's defaults; they do not affect d, n, τd or τp of the bottom. On screen the defaults are left by keeping those fields empty.
Stilling basin, USBR EM 25 Example 1 (Basin I / hydraulic jump)
Peterka, A.J., Hydraulic Design of Stilling Basins and Energy Dissipators, Engineering Monograph No. 25, U.S. Bureau of Reclamation, Denver, 1958, revised 1984; Section 1, Example 1, with Fig. 7 (length of jump). Page not recorded.
Problem
A jump on a horizontal apron with entering velocity V1 = 85 ft/s and depth D1 = 5.6 ft. EM 25 gives Fr = 6.34, D2/D1 = 8.5, D2 = 47.6 ft, L/D2 = 6.13 from Fig. 7, so L = 292 ft, and 58% of the energy is lost.
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- In the ribbon’s Units group, open SI Units and choose US customary: feet, ft³/s.
- Click the Basin tool. Type Discharge Q 476 ft³/s and Basin width W 1 ft; under ENTERING FLOW click Depth D1 and type Entering depth D1 5.6 ft; leave Tailwater depth empty; under BASIN TYPE click I.
- Read Velocity V1 85.000 ft/s, Froude number Fr1 6.33, Type “USBR Type I”, Conjugate depth D2 47.429 ft, L/D2 (EM 25 Fig. 12) 6.10, Length L 289.31 ft and Share of the energy lost 58.4 %. (A note “EM 25 suggests USBR Type II for Fr = 6.33” is also shown, as Type I is forced.)
- Checked by tests/verify/design-12-em25-ex1.script.
D2/D1 = 8.5 and L/D2 = 6.13 are EM 25 chart readings (D2 by chart, length from Fig. 7). Flume uses Bélanger's equation for D2 (8.47·D1) and a digitized Fig. 12 curve for the length (L/D2 = 6.10 at this Froude number vs EM 25's 6.13), so both differences come from chart reading. Fig. 12 was digitized by tracing pixels on a render of the USBR PDF. The test uses a 1 ft width; on screen this is Q = 476 ft³/s with W = 1 ft. The screen shows Fr to two decimals (6.33). Because Type I is chosen by hand, the screen also notes that EM 25 would suggest Type II at this Froude number.
Stilling basin Type II, USBR EM 25 Example 2
Peterka, A.J., Hydraulic Design of Stilling Basins and Energy Dissipators, Engineering Monograph No. 25, USBR, 1958, revised 1984; Section 2 (Basin II), Example 2, with Figs. 10–12. Page not recorded.
Problem
Design a Type II basin for q = 480 ft³/s/ft with entering velocity V1 = 108.2 ft/s. EM 25: D1 = 4.44 ft, Fr = 9.04, D2 = 54.6 ft, sweep-out tailwater 11.85·D1 = 52.6 ft (Fig. 11), length 4.28·D2 = 234 ft (Fig. 12), chute blocks D1 high (4 ft 6 in), dentated sill 0.2·D2 = 11 ft high with dentates 0.15·D2 = 8 ft 3 in wide and apart.
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- In the ribbon’s Units group, open SI Units and choose US customary: feet, ft³/s.
- Click the Basin tool. Type Discharge Q 24000 ft³/s and Basin width W 50 ft (q = 480 ft³/s per ft); under ENTERING FLOW click Velocity V1 and type Entering velocity V1 108.2 ft/s; leave Tailwater depth empty; under BASIN TYPE click Auto.
- Read Depth D1 4.436 ft, Froude number Fr1 9.06, Type “USBR Type II”, Conjugate depth D2 54.645 ft, Sweep-out tailwater 52.413 ft, Length L 233.43 ft; CHUTE BLOCKS Height 4.436 ft; DENTATED END SILL Height 10.929 ft and Dentate width 8.197 ft.
- Checked by tests/verify/design-13-em25-ex2.script.
The sweep-out ratio (11.85) and L/D2 (4.28) are read by EM 25 from Figs. 11 and 12; Flume's digitized curves give 11.79 and 4.27 at this Fr. EM 25 rounds the block and sill sizes up to practical dimensions (4 ft 6 in, 11 ft, 8 ft 3 in); Flume reports the unrounded D1, 0.2·D2 and 0.15·D2. Fr is shown to two decimals on screen (9.06).
Stilling basin Type III, USBR EM 25 Example 3
Peterka, A.J., Hydraulic Design of Stilling Basins and Energy Dissipators, Engineering Monograph No. 25, USBR, 1958, revised 1984; Section 3 (Basin III), Example 3, with Figs. 16–18. Page not recorded.
Problem
Design a Type III basin for Q = 3,900 ft³/s, width 50 ft, V1 = 69 ft/s, D1 = 1.130 ft. EM 25: Fr = 11.42, D2/D1 = 15.75, D2 = 17.80 ft, L/D2 = 2.75, L = 48.96 ft; chute blocks D1 high; baffle piers h3 = 2.5·D1 = 2.825 ft high, 0.75·h3 wide (25.5 in), placed 0.8·D2 = 14.24 ft downstream of the chute blocks; end sill h4 = 1.60·D1 = 1.81 ft. The example lowers the floor 2.5 ft to provide tailwater.
Results
Reproduce in Flume
- Open the Design tab (menu View ▸ Design (Pro), or the Design tab of the ribbon).
- In the ribbon’s Units group, open SI Units and choose US customary: feet, ft³/s.
- Click the Basin tool. Type Discharge Q 3900 ft³/s and Basin width W 50 ft; under ENTERING FLOW click Depth D1 and type Entering depth D1 1.130 ft; leave Tailwater depth empty; under BASIN TYPE click III.
- Read Velocity V1 69.027 ft/s, Froude number Fr1 11.45, Type “USBR Type III”, Conjugate depth D2 17.738 ft, L/D2 (EM 25 Fig. 12) 2.74, Length L 48.682 ft; CHUTE BLOCKS Height 1.130 ft; BAFFLE PIERS Height h3 2.851 ft, Width and spacing 2.138, 2.407 ft (width 25.66 in), From the chute blocks 14.190 ft; END SILL Height h4 1.843 ft. The warning “Type III is limited to about 60 ft/s (18 m/s) and 200 ft³/s per ft …: baffle piers may cavitate” is shown.
- Type Tailwater depth 15.24 ft: Tailwater is reads “Short by 2.498 ft” (the floor lowering).
- Click Auto: Type reads “USBR Type II”.
- Checked by tests/verify/design-14-em25-ex3.script.
D2/D1 = 15.75, L/D2 = 2.75, h3/D1 = 2.5 and h4/D1 = 1.60 are read by EM 25 from Figs. 16–18. Flume uses Bélanger's D2 (15.70·D1 at its Fr) and its own fits of Fig. 18 (2.52 and 1.63 at this Fr), so the differences are chart-reading differences. The Froude difference (+0.028 against a ±0.03 tolerance) is the tightest margin in this module: EM 25's 11.42 vs √ arithmetic 69.03/√(32.174·1.130) = 11.45; the reviewer may check how EM 25 rounded it. EM 25's own Type III limit is V1 ≤ 60 ft/s, yet this example has 69 ft/s; Flume warns and, on auto, picks Type II. On screen the tailwater step types 15.24 ft (EM 25’s D2 17.74 ft rounded − 2.5 ft), so the shortfall reads 2.498 ft; the test sets the tailwater exactly 2.5 ft below Flume’s D2 and gets 2.5000. With Auto chosen Flume picks Type II, as above.
Other checks (not from a publication)
- Best section: the half hexagon for Q = 400 ft³/s, S = 0.0016, n = 0.025 has depth 6.6148 ft by the closed form y = [Qn/(1.486·√3·(½)^(2/3)·√S)]^(3/8); Flume 6.6148; hydro's normal depth for that section also 6.6148; R = y/2 = 3.3074.
- Best section optimality: bottom widths ×0.7, 0.9, 1.1, 1.4 (same z = 1/√3) need more area: 76.25, 75.84, 75.83, 76.45 ft² vs 75.79 ft².
- Best trapezoid with set z = 2: b/y = 2(√5 − 2) = 0.4721 and R = y/2 (0.7592 m), Flume exact.
- Half hexagon SI = US: 6.6150 ft (from SI) vs 6.6148 ft.
- Lined channel: b/y = 3 is kept (3.0000) and its depth 1.0280 m is hydro's normal depth; default design is the best section (R = y/2 = 0.7383 m); bank height = depth + USBR bank freeboard (2.3049 m).
- Freeboard formula F = √(C·y): C = 2.5 at 3,000 ft³/s, y = 10 ft → 5.0000 ft; C = 1.5 below 20 ft³/s, y = 1.25 ft → 1.3693 ft. SI = US at 1,000 ft³/s, 6 ft: bank 3.4900 ft, formula 3.3126 ft both ways. Bank > hard lining > earth lining.
- Composite n: one n = 0.02 everywhere gives 0.0200 by Horton–Einstein, Pavlovskii, perimeter-weighted, Colebatch and Krishnamurthy–Christensen. Two equal halves (n 0.015 and 0.035): Pavlovskii √((n₁²+n₂²)/2) = 0.0269, Lotter harmonic mean 0.0210, Krishnamurthy √(n₁n₂) = 0.0229, all exact. Lotter without areas is reported as a problem.
- Cowan: meander m = 1.15 multiplies the sum ((0.025 + 0.005)·1.15 = 0.0345); m < 1 gives 0 (bad input).
- Lane's rule (Lane 1955, as given by Chow): τ = 0.4 lb/ft² per inch of d75 → 0.4000 for d75 = 1 in; 25.4 mm in SI → 19.1521 N/m² (= 0.4 × 47.880259). A side steeper than the repose angle is reported as a problem.
- Permissible velocity (Chow's procedure, hand check): Q = 400 ft³/s, S = 0.0016, n = 0.025, z = 2, V = 4.5 ft/s → V = 4.5000, R = (Vn/1.486√S)^1.5 = 2.6038 ft, A = Q/V = 88.8889 ft²; SI = US width 18.5622 vs 18.5676 ft (±0.01); an unreachable velocity is reported as a problem.
- Riprap: Table 6.1 midway (Re = 1.2×10⁵) gives F* = 0.0985 and SF = 1.25 by interpolation; "smallest stable" sizing converges to a just-stable 0.1397 m for the SI example; above 10% slope Eq. 6.11 sizes bottom and sides; at 7% the bottom D50 is the larger of Eqs. 6.8 and 6.11 (0.2195 m); SI = US depth 0.5203 vs 0.5200 m.
- Basins: Fr = 3.44 picks Type IV, with tailwater 1.1·D2 (2.8935 m), deflector blocks 2·D1 high and 2·D1 top length (1.2 m); Fr = 1.81 picks Type I; Fr = 1.35 needs no basin; subcritical entry is a problem.
- Basins: D1 from a head of 8 m keeps the specific energy (D1 + V1²/2g = 8.0000 m); chute blocks with half spaces fill the 50 ft width exactly; dentates reach both walls (50.0000 ft); Type II tailwater = 1.05·D2 (57.3768 ft); EM 25 Ex. 3 length SI = US (48.6818 vs 48.6819 ft); tailwater 2.5 ft short gives floor lowering 2.5000 ft.
Limits and open points for review
- Chart-digitized values: USBR Fig. 1-9 (freeboard), EM 25 Figs. 11, 12 and 18 (sweep-out tailwater, basin length, baffle and end-sill heights) were digitized by tracing pixels on renders of the USBR PDFs. Published values from these charts (1.3 ft freeboard, L/D2 6.13, 4.28, 2.75, 11.85·D1, 2.5·D1, 1.60·D1) are themselves chart readings, so differences of 1–5% are reading error, not method error.
- Ponce Example 6-2 prints F = 0.418 in its text (flow depth) and 0.476 from the calculator (hydraulic depth); the test uses 0.476.
- Ponce tractive-force example B prints both b = 154 ft (step 19) and 152 ft (step 20); the test uses 152 ft with ±3 ft.
- Tractive force: Flume does not hold Chow's Fig. 7-7 (side factor C_s) or the permissible-stress curves (Fig. 7-10); the user must enter them. The default side factor is HEC-15's K1.
- Permissible velocity: no published example is tested. Ponce §6.2 Examples 6-3 and 6-4 (maximum permissible velocity, 2.39 m/s and 3.21 ft/s) exist online and could be added as published checks.
- Freeboard formula √(C·y): Chow gives only C = 1.5 (20 ft³/s) and 2.5 (3,000 ft³/s); the linear interpolation in Q between them is Flume's assumption.
- EM 25 Example 3 has V1 = 69 ft/s, above Type III's own 60 ft/s limit; Flume flags it and would pick Type II on auto.
- EM 25 Ex. 3 Froude number passes with +0.028 against ±0.03; HEC-15 CU D50 values pass with −1.6 to −1.7% against tolerances set just wide enough. These are the tightest margins in this module.
- WSP 2339 section 2: the test feeds Flume's unrounded weighted n (0.0304) into Cowan's sum, giving 0.0344 vs the paper's 0.034 (which uses 0.030).
- Not tested against a publication: Bathurst's n for shallow riprap (da/D50 < 1.5; n jumps at 1.5), HEC-15 steep-slope Eq. 6.11, Pavlovskii/Lotter/Colebatch/Krishnamurthy composite methods, Type IV basin proportions.
- Citations: page numbers for Chow Table 7-1, the USBR canal manual §2-6/Fig. 1-9, HEC-15 sections and EM 25 examples were not checked against the printed books; section numbers are from the test comments.
- Basins: level floor, rectangular section; D1 from head ignores chute losses (EM 25 Fig. 15 not built in).
Culvert hydraulics (culvert/)Flume Pro
Inlet- and outlet-control headwater of circular and box culverts by FHWA HDS-5 (3rd ed.): the inlet control equations of Appendix A, full and part-full outlet control by the approximate hand method or a backwater profile, the outlet velocity, and roadway overtopping with the split of a total discharge between culvert and road and the performance curve.
Inlet control equations, elliptical structural plate culvert, HDS-5 Appendix A.3.1
Schall, J.D., Thompson, P.L., Zerges, S.M., Kilgore, R.T. and Morris, J.L., Hydraulic Design of Highway Culverts, Hydraulic Design Series No. 5 (HDS-5), 3rd ed., FHWA-HIF-12-026, Federal Highway Administration, April 2012; Appendix A, section A.3.1, example table of HWi/D (p. A.4 as cited in the test; page to be confirmed in the book).
Problem
Appendix A works the inlet control equations for a structural plate ellipse with a thin-wall projecting inlet (form 1 constants K = 0.0340, M = 1.5, c = 0.0496, Y = 0.53) on a slope of 0.02. Its table gives HWi/D for several values of the flow factor Q/AD^0.5: from the unsubmerged equation (A.1, which needs Hc/D) and from the submerged equation (A.3).
Results
Reproduce in Flume
- Cannot be entered in the app: the Culvert screen offers only “Box” and “Circular” barrels, and its inlet list (HDS-5 Table A.1 charts 1–3 and 8–13) has no structural plate ellipse. The check calls the inlet equations (unsubmergedRatio, submergedRatio) directly with the ellipse constants and Hc/D from the book's table, so it verifies equations A.1 and A.3 as coded; no script.
Published values are printed in the Appendix A table to two decimals; the tolerance (±0.006, ±0.007 at 4.6) is a little over half a unit in the last place. Hc/D for the unsubmerged rows is taken from the same table, not computed by Flume.
Composite Manning's n of a partly lined CMP, HDS-5 section 3.1.4
Schall, J.D., Thompson, P.L., Zerges, S.M., Kilgore, R.T. and Morris, J.L., Hydraulic Design of Highway Culverts, Hydraulic Design Series No. 5 (HDS-5), 3rd ed., FHWA-HIF-12-026, Federal Highway Administration, April 2012; section 3.1.4 (composite roughness, eq. 3.8), worked example in the text; page to be confirmed.
Problem
A 6 ft corrugated metal pipe (n = 0.026) has a smooth lining (n = 0.013) over 40% of its perimeter. Find the composite n of the barrel.
Results
Reproduce in Flume
- Cannot be entered in the app: the Culvert screen has one “Manning's n” field for the barrel and no composite-roughness input (perimeters and n of a lined and an unlined part). The check calls compositeN directly; no script.
The perimeters 11.30 ft and 7.54 ft are 60% and 40% of the circumference π·6 = 18.85 ft (computed for the test from the stated 40%). Published value printed to three decimals.
Pipe culvert selection, HDS-5 Design Guideline 1.3 (Example Problem 1)
Schall, J.D., Thompson, P.L., Zerges, S.M., Kilgore, R.T. and Morris, J.L., Hydraulic Design of Highway Culverts, Hydraulic Design Series No. 5 (HDS-5), 3rd ed., FHWA-HIF-12-026, Federal Highway Administration, April 2012; Design Guideline 1, DG 1.3 (Example Problem 1) and Culvert Design Form DG 1.3.3, with the HY-8 results quoted in the guideline; pages to be confirmed.
Problem
Size a culvert for Q = 200 cfs with tailwater 3.5 ft, barrel slope 0.01 and length 200 ft, inlet invert at elevation 100 ft. Three barrels are tried: a 54 in concrete pipe and a 60 in concrete pipe (groove end with headwall, ke = 0.2, n = 0.012), and a 72 in CMP with a 45° beveled edge in a headwall (n = 0.024, ke = 0.2). For each, inlet and outlet control headwater, critical depth, outlet losses H and outlet velocity are found on the design form.
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). In the ribbon's Units group open the units menu (“SI Units”) and choose “US customary: feet, ft³/s”. Changing units converts what is in the fields; the values below are typed in afterwards.
- In the Structures tab click the “Culvert” chip at the top of the inputs.
- Under Barrel click “Circular”. Type Diameter D = 4.5 ft, Barrels = 1, Manning's n = 0.012, Length = 200 ft, Inlet invert = 100 ft, Outlet invert = 98 ft.
- Under Inlet click the list button (“Inlet types”) and choose “Concrete pipe, groove end with headwall” (Table A.1 chart 1, scale 2; it puts ke 0.2 in the field). Check Entrance loss ke = 0.2 and Exit loss coefficient = 1. In the picker below make sure “HDS-5 approximate” is chosen (it is the default).
- Under Flow type Discharge Q = 200 ft³/s; in the tailwater picker choose “Constant” and type Tailwater depth = 3.5 ft.
- Under Road turn off “Road over the culvert”. Under Performance curve type Up to discharge = 200 ft³/s (it only sets the curve's range).
- Read under Headwater: Control = Inlet; Inlet control HWi 7.925 ft; Outlet control HWo 6.980 ft; Losses H 4.712 ft; Critical depth dc 4.036 ft; Outlet velocity 15.228 ft/s.
- Change Diameter D to 5 ft (60 in). Read Inlet control HWi 6.705 ft, Losses H 2.940 ft, Outlet control HWo 5.458 ft, Outlet velocity 15.589 ft/s.
- Change Diameter D to 6 ft and Manning's n to 0.024; from “Inlet types” choose “Pipe, beveled ring, 45° bevels” (chart 3, scale 1: the 45° beveled edge in a headwall) and check Entrance loss ke = 0.2. Read Inlet regime = unsubmerged, Inlet control HWi 5.665 ft, Critical depth dc 3.866 ft.
- Checked by tests/verify/culvert-01-dg13-pipes.script.
The form values were read by the guideline's author off HDS-5's nomographs and charts (dc from the critical depth chart; HWi from the inlet control nomographs), which section A.4 of the manual puts within ±10% of the equations; Flume solves the equations, hence the 5% tolerance on chart answers. HWo is the form's outlet-control headwater elevation (107.0 and 105.5 ft) less the inlet invert 100 ft. HY-8 results quoted in the guideline are checked to 2%.
The control row is not numeric: the guideline finds inlet control for the 54 in RCP and Flume agrees.
On screen: the values are the Flume column rounded to three decimals (HWi 7.925, dc 4.036, H 4.712, HWo 6.980, V 15.228 ft/s; 60 in: 6.705, 2.940, 5.458, 15.589; CMP: 5.665, 3.866), no other differences. The outlet method matters here: the other method, “Profile” (as HY-8), gives other outlet-control numbers for the same inputs (54 in: HWo 7.334 ft; 60 in: 6.622 ft; 72 in CMP: HWo 5.892 ft above HWi 5.665 ft, so outlet control and an outlet velocity of 10.385 ft/s), so the design form is reproduced with “HDS-5 approximate”, the default.
Box culvert selection, HDS-5 Design Guideline 1.4 (Example Problem 2)
Schall, J.D., Thompson, P.L., Zerges, S.M., Kilgore, R.T. and Morris, J.L., Hydraulic Design of Highway Culverts, Hydraulic Design Series No. 5 (HDS-5), 3rd ed., FHWA-HIF-12-026, Federal Highway Administration, April 2012; Design Guideline 1, DG 1.4 (Example Problem 2) and Culvert Design Form DG 1.4.3, with the HY-8 result quoted in the guideline; pages to be confirmed.
Problem
Size a concrete box culvert for Q = 300 cfs with tailwater 4.0 ft, slope 0.02 and length 250 ft (n = 0.012). A 6 ft × 5 ft box and a 5 ft × 5 ft box with square edges in a 90° headwall (ke = 0.5) are tried, then the 5 × 5 box with 45° bevels (ke = 0.2).
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). In the ribbon's Units group open the units menu (“SI Units”) and choose “US customary: feet, ft³/s”. Changing units converts what is in the fields; the values below are typed in afterwards.
- In the Structures tab click the “Culvert” chip at the top of the inputs.
- Under Barrel click “Box”. Type Span = 6 ft, Rise = 5 ft, Barrels = 1, Manning's n = 0.012, Length = 250 ft, Inlet invert = 100 ft, Outlet invert = 95 ft.
- From “Inlet types” choose “Box, 90° headwall or 15° wingwall flares, square edges” (chart 8, scale 2); Entrance loss ke = 0.5, Exit loss coefficient = 1. Choose “HDS-5 approximate”.
- Type Discharge Q = 300 ft³/s; choose “Constant” and type Tailwater depth = 4 ft. Turn off “Road over the culvert”; Up to discharge = 300 ft³/s.
- Read Inlet control HWi 7.950 ft, Critical depth dc 4.267 ft, Losses H 3.409 ft (Control = Inlet).
- Change Span to 5 ft. Read Inlet control HWi 9.710 ft, Losses H 5.100 ft, Critical depth dc 4.819 ft, Outlet velocity 21.164 ft/s.
- From “Inlet types” choose “Box, 90° headwall, 45° bevels” (chart 10, scale 2), which sets Entrance loss ke = 0.2. Read Inlet control HWi 8.572 ft. (Losses H then reads 4.429 ft: see the note on the form's 5.0 ft.)
- Checked by tests/verify/culvert-02-dg14-boxes.script.
Form values come from the nomographs and charts (±10% of the equations per section A.4); the HY-8 figure for the 5×5 box is checked to 2%. Flume's 6×5 losses are 4.0% under the form's 3.55 ft, the largest outlet-loss difference in this module.
On screen: the Flume column rounded to three decimals, no other differences. With the other outlet method, “Profile”, HWi and control are unchanged (inlet control), but HWo differs (6×5: 7.468 ft; 5×5: 8.433 ft); the steps use “HDS-5 approximate”, the default.
Inconsistency in the source, not tested: for the beveled 5×5 box the form gives outlet losses H = 5.0 ft, but with ke = 0.2 eq. 3.5 gives about 4.4 ft; the form appears to carry over a nomograph reading made with the square-edge ke. The reviewer may want to check that line of form DG 1.4.3.
Existing box culvert with roadway overtopping, HDS-5 Design Guideline 1.5 (Example Problem 4)
Schall, J.D., Thompson, P.L., Zerges, S.M., Kilgore, R.T. and Morris, J.L., Hydraulic Design of Highway Culverts, Hydraulic Design Series No. 5 (HDS-5), 3rd ed., FHWA-HIF-12-026, Federal Highway Administration, April 2012; Design Guideline 1, DG 1.5 (Example Problem 4), Culvert Design Form DG 1.5.3 and the HY-8 results of DG 1.5.2; Figure 3.11 (overtopping coefficients); pages to be confirmed.
Problem
An existing 7 ft × 7 ft concrete box (square edges in a headwall, ke = 0.5, n = 0.012), 200 ft long with inverts at 100 and 90 ft (S = 0.05), is analysed for discharges from 400 to 1000 cfs using a tailwater rating. The road over it (gravel, crest at 116.0 ft, 200 ft long, 40 ft wide) overtops at the higher flows: the guideline finds the overtopping coefficient from Figure 3.11B, the overtopping flow at 0.5 ft over the road, and (with HY-8) the discharge at which overtopping starts and the split of 1000 cfs between culvert and road.
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). In the ribbon's Units group open the units menu (“SI Units”) and choose “US customary: feet, ft³/s”. Changing units converts what is in the fields; the values below are typed in afterwards.
- In the Structures tab click the “Culvert” chip at the top of the inputs.
- Under Barrel click “Box”. Type Span = 7 ft, Rise = 7 ft, Barrels = 1, Manning's n = 0.012, Length = 200 ft, Inlet invert = 100 ft, Outlet invert = 90 ft.
- From “Inlet types” choose “Box, 90° headwall or 15° wingwall flares, square edges”; Entrance loss ke = 0.5, Exit loss coefficient = 1. Choose “HDS-5 approximate”.
- In the tailwater picker choose “Rating” and type the four rows (columns Q (ft³/s), TW (ft)): 400 / 2.6, 600 / 3.1, 800 / 3.8, 1000 / 4.1.
- Turn off “Road over the culvert”; type Up to discharge = 1000 ft³/s.
- Type Discharge Q = 400, 600, 700, 800, 850 and 1000 ft³/s in turn and read Inlet control HWi: 7.816, 11.423, 13.588, 16.087, 17.462 and 22.085 ft, with Control = Inlet each time. Tailwater depth shows 3.450 ft at 700 and 3.875 ft at 850 ft³/s (interpolated in the rating).
- At 400 ft³/s read Losses H 1.966 ft and Outlet control HWo −2.202 ft: the outlet-control headwater elevation ELho is the inlet invert plus HWo, 100 − 2.202 = 97.798 ft. At 1000 ft³/s read Losses H 12.285 ft.
- Turn on “Road over the culvert”: Crest elevation = 116 ft, Crest length = 200 ft, Road width = 40 ft, choose “Gravel”; Up to discharge = 1000 ft³/s; Discharge Q = 1000 ft³/s.
- Read Culvert flow 814.97 ft³/s, Road overtopping flow 185.03 ft³/s, Headwater elevation 116.490 ft and Overtopping starts at 796.72 ft³/s. (The Performance curve table under the figure agrees: Road Q 0 up to 700 ft³/s and 2.255 ft³/s at 800 ft³/s.)
- Cr at HWr = 0.5 and 1.5 ft and the overtopping flow at HWr = 0.5 ft cannot be read for a chosen head: the screen gives the road only at the headwater of the discharge entered. At 1000 ft³/s it shows Head on the road HWr 0.4901 ft and Crest coefficient Cr (US) 2.697 (the published Cr at 0.5 ft is 2.70); the three rows are checked by the engine test only.
- Checked by tests/verify/culvert-03-dg15-overtopping.script.
HWi and H come from the design form (nomograph and chart readings, ±10% of the equations per section A.4). Flume is 0.8–3.5% low on all six HWi values; the largest gap is −3.5% at 400 cfs, then −2.5% at 800 cfs and −2.4% at 850 cfs, inside the 5% chart tolerance. The consistent low bias may be worth a look against HY-8 if it is available.
Cr = 2.70 and 2.92 were read by the guideline off Figure 3.11B; Flume's Figure 3.11 curves were digitised by eye from the PDF figure, to about ±0.01 on Cr. Qo = 191 ft³/s is the guideline's hand calculation 2.7 × 200 × 0.5^1.5.
The last four rows are HY-8 program results quoted in the guideline, not hand calculations; HY-8 uses polynomial fits of the same equations. The road flow is checked to 8% because it is a small difference of two large numbers (Flume +0.8%).
On screen: ELho is not shown as an elevation; it is the inlet invert plus “Outlet control HWo” (100 − 2.202 = 97.798 ft, the Flume 97.7978). The Cr rows at HWr = 0.5 and 1.5 ft and Qo at HWr = 0.5 ft can't be read on the screen, which reports the road only at the headwater of the discharge entered (at 1000 ft³/s: HWr 0.4901 ft, Cr 2.697); they are checked by the engine test only. The other values are the Flume column rounded. With the other outlet method, “Profile”, the 400 ft³/s case turns to outlet control (HWo 8.163 ft, the critical-depth inlet headwater of a supercritical barrel, above HWi 7.816 ft) with the warning “Supercritical barrel flow with outlet control”; the guideline's inlet control at all six flows needs “HDS-5 approximate”, the default.
The tailwater at 700 and 850 cfs is interpolated linearly in the rating (3.45 and 3.875 ft); the guideline's own values at those flows should be checked against the form.
Other checks (not from a publication)
- Table A.1 entry: chart 1 scale 2 (concrete pipe, groove end with headwall) c = 0.0292 and chart 8 scale 2 (box, square edges) Y = 0.80 match the printed table; 26 pipe and box rows are entered; a mitered CMP gets the +0.7·S slope correction.
- Tailwater rating interpolation at 700 cfs: 3.45 ft, the straight-line value between 3.1 ft (600 cfs) and 3.8 ft (800 cfs) of the DG 1.5 rating (not a published number).
- SI = US for the DG 1.3 54 in RCP run in metres: HWi 7.9235 ft vs 7.9251 ft, HWo 6.9801 vs 6.9799 ft, outlet velocity 15.2274 vs 15.2281 ft/s; overtopping (Cd × 0.552 in SI) 190.9188 ft³/s both ways.
- Full barrel with a submerged outlet (54 in RCP, TW 6.0 ft): HWo = TW + (1 + ke)·V²/2g + hf − S·L (eq. 3.6b) = 8.7117 ft by both the approximate and the profile method.
- Friction loss against eq. 3.4b with Ku = 29 and R^1.33: 1.7627 ft vs 1.7549 ft (+0.4%; Flume uses R^4/3 and its own g, equal to Ku = 29.1).
- Profile method, mild 1.2 m pipe (Q 0.8 m³/s, TW 0.1 m): M2 profile with the inlet depth 0.623 m between yc 0.482 m and yn 0.704 m; HWo 0.762 m, below the approximate method's 0.845 m, which warns that HWo < 0.75D.
- Outlet velocity at critical depth equals Q/A(yc): 1.8822 m/s; a 3000 m barrel reaches normal depth at the inlet (0.7040 m).
- M1 profile with tailwater 1.15 m: inlet depth above the tailwater less the 0.06 m drop. Overloaded 300 m barrel at 2.0 m³/s: full for 140.9 m of its length, HWo 1.669 m.
- Steep barrel with a free outlet: supercritical, inlet control.
- Inlet curve continuous where the unsubmerged equation hands over at Q/AD^0.5 = 3.5 (4.7577 vs 4.7576 ft) and rising with discharge over 5–400 cfs.
- culvertFlowAt round trip: 200.0000 ft³/s back from the 54 in RCP headwater; two identical barrels at 800 cfs give the same headwater as one at 400 cfs.
- Figure 3.11C submergence factor kt: 1 for a free weir, 0 fully submerged.
- Bad input (n = 0, negative discharge) gives a problem message, not a crash; zero discharge gives zero headwater.
- Performance curve for DG 1.5: 10 points, rising, no overtopping below 798 cfs.
Limits and open points for review
- Every DG answer except the HY-8 lines and the Appendix A table was read by the guideline author off nomographs and charts; Flume solves the equations, so differences of a few percent are expected (tolerance 5%, the manual quotes ±10%).
- Page numbers in HDS-5 for Appendix A.3.1, section 3.1.4 and the Design Guidelines were not confirmed in this round; please add them from the PDF (FHWA-HIF-12-026).
- DG 1.4: the beveled 5×5 box's outlet losses H = 5.0 ft on the form disagree with eq. 3.5 (≈ 4.4 ft with ke = 0.2) and are not tested.
- DG 1.5: the tailwater at 700 and 850 cfs was interpolated by Flume from the four-point rating; confirm the form uses the same values.
- Figure 3.11 overtopping coefficients (Cr and kt) were digitised by eye, about ±0.01 on Cr. The road is a single level weir; sag profiles need several segments.
- Only circular and box barrels; no pipe-arch, ellipse or arch barrels (so the A.3.1 check exercises the equations only), no tapered inlets, no South Dakota or open-bottom tables. The ke attached to each Table A.1 row is Flume's own match to Table C.2.
- The design guidelines were reproduced with the approximate (hand) outlet method; the profile method (the other choice) was only hand-checked.
- The design guidelines DG 1.3–1.5 are reproduced on the Culvert screen (tests/verify/culvert-*.script). The Appendix A.3.1 ellipse and the composite n of section 3.1.4 can't be entered there (no ellipse barrel, no composite-roughness input), and the DG 1.5 road coefficients at a chosen head are engine-only.
Weirs, spillways, drops and bridges (weirs/)Flume Pro
Discharge and head of uncontrolled ogee crests (USBR Design of Small Dams), sharp-crested V-notch, rectangular, Francis and Cipolletti weirs (USBR Water Measurement Manual), broad-crested weirs and trapezoidal labyrinth weirs (Crookston & Tullis); the geometry of straight drop structures (Rand, HEC-14 SAF basin); and the low-flow water surface through bridges by the energy, momentum and Yarnell methods (HEC-RAS).
Uncontrolled ogee crest, Design of Small Dams §9.13 Example 1 and table 9-2
U.S. Bureau of Reclamation, Design of Small Dams, 3rd ed., U.S. Government Printing Office, Denver, 1987; chapter 9, §9.13, Example 1, table 9-2 (discharge computation) and figs. 9-23, 9-24, 9-25, 9-27; pages to be confirmed.
Problem
An overflow ogee crest with a design head H0 = 4.89 ft, 2 ft high above the approach floor (P = 2 ft), a 1:1 sloping upstream face and the downstream apron 2 ft below the crest. Find the coefficient at the design head from the charts, the rating of table 9-2 for a 50 ft crest (piers neglected), and the crest length needed for 2,000 ft³/s with two 18 in round-nosed piers and abutments rounded/flared so that Ka = 0.
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). In the ribbon's Units group open the units menu (“SI Units”) and choose “US customary: feet, ft³/s”. Changing units converts what is in the fields; the values below are typed in afterwards.
- Click the “Spillway” chip at the top of the inputs.
- Under Ogee crest type Design head H0 = 4.89 ft, Crest height P = 2 ft, Net crest length L' = 50 ft, Upstream face slope = 1 H:1V, Piers N = 0. In the Abutments menu choose “Rounded and flared” (Ka = 0).
- Under Downstream type Apron below the crest = 2 ft and leave Tailwater above the crest empty. Under Head type Head He = 4.89 ft and leave Design discharge empty.
- Read under Flow: “C0 for P/H0 = 0.409” 3.763 ft½/s, Upstream face Ci/Cv 1.0173, Apron ratio 0.9648, Coefficient C 3.694 ft½/s (Discharge Q 1997.0 ft³/s, Effective length L 50.000 ft).
- The table under the figure, “Rating at 0.1 to 1.2 times the design head”, gives Head He, Discharge and C: He 0.4890 ft → 54.001 ft³/s, C 3.1584; 0.9780 → 157.74, 3.2618; 1.9560 → 472.85, 3.4570; 2.9340 → 902.33, 3.5909; 3.9120 → 1416.7, 3.6619; 4.8900 → 1997.0, 3.6936; 5.8680 → 2641.4, 3.7164 (the rows of He/H0 = 0.1, 0.2, 0.4, 0.6, 0.8, 1.0, 1.2).
- Type Piers N = 2, choose “Rounded” in the Pier nose menu (Kp = 0.01) and type Design discharge = 2000 ft³/s. Read “For the design discharge: L” 50.074 ft and “Net length L'” 50.270 ft.
- The head for 2,000 ft³/s can't be read: the Spillway screen gives the discharge at a head, not the head at a discharge. With the piers back to 0 it shows 1997.0 ft³/s at He = 4.89 ft, i.e. 2,000 ft³/s needs a head just above 4.89 ft (the engine test's 4.8947 ft).
- Checked by tests/verify/weirs-01-ogee-dsd-example1.script.
All published coefficients were read by the book off figs. 9-23 to 9-27; Flume's curves were digitized from the scanned book, about ±0.01 on C0 and ±0.005 on the ratios, and its C0 runs about 0.008 below the values the book quotes. Hence C is checked to ±0.03–0.045 and Q to ±2.5%.
Inconsistency in the source: at He/H0 = 1.2 table 9-2 takes C/C0 = 1.03 from fig. 9-24, where the printed curve reads about 1.023. Flume follows the curve, so that row is 0.044 low on C (just inside ±0.045) and 1.3% low on Q. Please check fig. 9-24 at 1.2.
The lengths are 0.17 ft longer than the book's mainly because Flume's C at H0 is 3.694 rather than 3.71.
On screen: the values are the Flume column to the screen's rounding (Q at He/H0 = 0.1 shows 54.001 ft³/s). The last row, the head for 2,000 ft³/s, is engine-only: the Spillway screen has no head-for-discharge solve, and shows 1997.0 ft³/s at 4.89 ft instead.
Ogee crest of a diversion dam with tailwater, Design of Small Dams §9.13 Example 2
U.S. Bureau of Reclamation, Design of Small Dams, 3rd ed., U.S. Government Printing Office, Denver, 1987; chapter 9, §9.13, Example 2, with figs. 9-23, 9-26 and 9-28; pages to be confirmed.
Problem
A diversion dam 8 ft high passes 2,000 ft³/s at a total head of 5.16 ft; the tailwater stands 3.5 ft above the crest, and the abutments are 90° walls rounded at 1 ft (Ka = 0.10). Find the coefficient allowing for submergence and the effective and net crest lengths. The head comes from a 5 ft depth over the crest plus the approach velocity head.
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). In the ribbon's Units group open the units menu (“SI Units”) and choose “US customary: feet, ft³/s”. Changing units converts what is in the fields; the values below are typed in afterwards.
- Click the “Spillway” chip at the top of the inputs.
- Under Ogee crest type Design head H0 = 5.16 ft, Crest height P = 8 ft, Net crest length L' = 46.7 ft, Upstream face slope = 0 (vertical), Piers N = 0; in the Abutments menu choose “Rounded 90° headwall” (Ka = 0.10).
- Under Downstream type Apron below the crest = 8 ft and Tailwater above the crest = 3.5 ft. Type Head He = 5.16 ft and Design discharge = 2000 ft³/s.
- Read “C0 for P/H0 = 1.550” 3.920 ft½/s, Coefficient C 3.692 ft½/s (Tailwater ratio 0.9419), “For the design discharge: L” 46.216 ft and “Net length L'” 47.248 ft.
- The total head from a 5 ft depth over the crest can't be entered: the Spillway screen takes the total head He directly and has no approach-channel width or velocity head. The engine test computes it (5.1653 ft).
- Checked by tests/verify/weirs-02-ogee-dsd-example2.script.
Method difference: the book takes the drowned-jump reduction (5%) from fig. 9-26; Flume has not digitized fig. 9-26 and uses fig. 9-28, which gives about 6%. C is therefore 1% low and the lengths 1.1–1.2% long; tolerances ±0.06 on C and ±2% on lengths reflect this.
On screen: the effective length shows 46.216 ft where the Flume column (from the engine test's 4-decimal print) has 46.217; the value is 46.2165 and the two prints round it differently. The last row (total head from a 5 ft depth) is engine-only: the Spillway screen takes He directly and has no approach channel.
The book's C0 = 3.93 is read from fig. 9-23. The approach width used for the 5 ft depth check (46.7 ft, the net crest length) is the test's choice; confirm against the book's statement of the approach channel.
V-notch weirs (Kindsvater–Shen), Bengtson example 2
Bengtson, H.H., Sharp-Crested Weirs for Open Channel Flow Measurement, Course No. C02-022, Continuing Education and Development, Inc. (CED), online PDH course (year to be confirmed); example 2; equations from U.S. Bureau of Reclamation, Water Measurement Manual, 3rd ed. (revised reprint 2001), chapter 7 (eq. 7-3, figs. 7-6a/b; Cone eq. 7-6).
Problem
Fully contracted sharp-crested V-notch weirs of 90°, 60° and 40°. Find the effective discharge coefficient Ce and head correction kh for each angle, and the discharge at heads of 0.2 ft and 1.25 ft by the Kindsvater–Shen equation Q = Ce·(8/15)·√(2g)·tan(θ/2)·(h + kh)^2.5. Part (a) also compares the 90° notch with the Cone equation.
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). In the ribbon's Units group open the units menu (“SI Units”) and choose “US customary: feet, ft³/s”. Changing units converts what is in the fields; the values below are typed in afterwards.
- Click the “Weir” chip at the top of the inputs.
- Click the “V-notch” chip. Type Notch angle θ = 90° and Head h = 0.2 ft. Read Discharge Q 0.0459 ft³/s, Coefficient Ce 0.5779, Head correction kh 0.0029 ft.
- Type Head h = 1.25 ft and read Discharge Q 4.344 ft³/s (also the value compared with the Cone equation).
- Notch angle θ = 60°: at 0.2 ft read Q 0.0267 ft³/s, Ce 0.5767, kh 0.0037 ft; at 1.25 ft read Q 2.507 ft³/s.
- Notch angle θ = 40°: at 0.2 ft read Q 0.0173 ft³/s, Ce 0.5820, kh 0.0055 ft; at 1.25 ft read Q 1.601 ft³/s.
- Checked by tests/verify/weirs-03-vnotch-bengtson2.script.
Ce and kh in Flume come from the LMNO polynomial fit of WMM figs. 7-6a/b, checked against the figures by eye; Bengtson's values are his own readings/fits of the same figures.
Inconsistency in the source: for 40° Bengtson prints kh = 0.0051 ft, but his own eq. 4 and WMM fig. 7-6a give 0.0055 ft; the table above uses 0.0055 as published value (changed from the printed 0.0051). Q = 1.60 ft³/s at 1.25 ft agrees with either.
The Cone row compares with WMM's empirical 90° equation as quoted in the same example, ±1%.
Suppressed rectangular weir (Kindsvater–Carter), Bengtson example 3
Bengtson, H.H., Sharp-Crested Weirs for Open Channel Flow Measurement, Course No. C02-022, Continuing Education and Development, Inc. (CED), online PDH course (year to be confirmed); example 3; method of U.S. Bureau of Reclamation, Water Measurement Manual, 3rd ed. (revised reprint 2001), chapter 7 (Kindsvater–Carter, table 7-1, fig. 7-4).
Problem
A fully suppressed rectangular sharp-crested weir, crest length 3 ft in a 3 ft wide channel, crest 1.5 ft above the bed. Compute the discharge at six heads with Q = Ce·(L + kb)·(h + kh)^1.5.
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). In the ribbon's Units group open the units menu (“SI Units”) and choose “US customary: feet, ft³/s”. Changing units converts what is in the fields; the values below are typed in afterwards.
- Click the “Weir” chip at the top of the inputs.
- Click the “Rectangular” chip (Kindsvater–Carter). Type Crest length L = 3 ft, Channel width B = 3 ft, Crest height P = 1.5 ft.
- Type Head h = 0.2, 0.3, 0.5, 0.7, 1.0 and 1.5 ft in turn and read Discharge Q: 0.8973, 1.650, 3.585, 6.018, 10.497 and 19.991 ft³/s.
- Checked by tests/verify/weirs-04-rect-suppressed-bengtson3.script.
Published Q printed in the course's results table. Ce is from WMM table 7-1 (Ce as a function of h/P for L/B = 1).
Contracted rectangular weirs, Bengtson example 5
Bengtson, H.H., Sharp-Crested Weirs for Open Channel Flow Measurement, Course No. C02-022, Continuing Education and Development, Inc. (CED), online PDH course (year to be confirmed); example 5 (columns Q9, Kindsvater–Carter, and Q10, Francis eq. 10); kb read there from U.S. Bureau of Reclamation, Water Measurement Manual, 3rd ed. (revised reprint 2001), chapter 7 fig. 7-4.
Problem
Five contracted rectangular sharp-crested weirs (channel width B, crest length L, head H, crest height P). Find kb from WMM fig. 7-4 and the discharge by Kindsvater–Carter (Q9), and by the Francis formula with two end contractions (Q10).
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). In the ribbon's Units group open the units menu (“SI Units”) and choose “US customary: feet, ft³/s”. Changing units converts what is in the fields; the values below are typed in afterwards.
- Click the “Weir” chip at the top of the inputs.
- Click the “Rectangular” chip (Kindsvater–Carter). For each case type Crest length L, Channel width B, Crest height P and Head h, and read Discharge Q and “Effective length L + kb” (kb = that length − L):
- Case i: L 2, B 4, P 1.0, h 0.5 ft → Q 2.297 ft³/s, L + kb 2.010 ft (kb 0.010 ft). Case ii: L 2.4, B 6, P 1.2, h 0.5 ft → Q 2.730 ft³/s, L + kb 2.409 ft (kb 0.009 ft). Case iii: L 3, B 6, P 2.4, h 0.75 ft → Q 6.278 ft³/s. Case iv: L 4.2, B 6, P 2.0, h 1.2 ft → Q 18.223 ft³/s, L + kb 4.213 ft (kb 0.013 ft). Case v: L 3, B 6, P 2.4, h 2.0 ft → Q 27.510 ft³/s.
- The Francis rows (Q10) can't be entered: the Weir tool offers V-notch, Rectangular (Kindsvater–Carter), Cipolletti and Broad-crested, not the Francis formula. They are checked by the engine test only.
- Checked by tests/verify/weirs-05-rect-contracted-bengtson5.script.
kb was read by the course off the small WMM fig. 7-4, and Flume's kb curve was read off the same figure; between L/B 0.9 and 1.0 the curve is steep (±0.002 ft there), but these cases are at 0.4–0.7.
On screen: kb is read as “Effective length L + kb” less L (2.010, 2.409 and 4.213 ft). The two Francis rows (Q10) are engine-only, because the Weir tool has no Francis weir.
Inconsistency in the source: the course's spreadsheet Q9 runs about 1% above a hand evaluation of its own equation for cases i–iv (case v agrees to 0.1%). Flume is 0.9–1.4% below the printed Q9 in cases i–iv, so the tolerance was widened to ±1.5%. Case i (−1.41%) is close to that limit; please check one case by hand from the course's Ce, kb and kh.
Cipolletti and Francis weirs, Bengtson example 6
Bengtson, H.H., Sharp-Crested Weirs for Open Channel Flow Measurement, Course No. C02-022, Continuing Education and Development, Inc. (CED), online PDH course (year to be confirmed); example 6; equations from U.S. Bureau of Reclamation, Water Measurement Manual, 3rd ed. (revised reprint 2001), chapter 7.
Problem
A weir with a 2 ft crest at heads of 0.2 and 0.7 ft: discharge as a Cipolletti (trapezoidal, 1:4 sides) weir, as a Francis weir with two end contractions, and (at 0.2 ft) as a suppressed Francis weir.
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). In the ribbon's Units group open the units menu (“SI Units”) and choose “US customary: feet, ft³/s”. Changing units converts what is in the fields; the values below are typed in afterwards.
- Click the “Weir” chip at the top of the inputs.
- Click the “Cipolletti” chip. Type Crest length L = 2 ft and Head h = 0.2 ft: read Discharge Q 0.6023 ft³/s (Coefficient C 3.3670 ft½/s). Type Head h = 0.7 ft: read Q 3.944 ft³/s.
- The three Francis rows can't be entered: the Weir tool has no Francis weir (its kinds are V-notch, Rectangular by Kindsvater–Carter, Cipolletti and Broad). They are checked by the engine test only.
- Checked by tests/verify/weirs-06-cipolletti-bengtson6.script.
Values printed to three decimals in the course; the tolerance is about half a unit in the last place.
On screen: only the two Cipolletti rows; the three Francis rows are engine-only, because the Weir tool has no Francis weir.
Labyrinth discharge coefficient, Crookston (2010) table 5-7
Crookston, B.M., Labyrinth Weirs, Ph.D. dissertation, Utah State University, Logan, 2010 (chapter 4 published as Crookston, B.M. and Tullis, B.P., Hydraulic design and analysis of labyrinth weirs. I: Discharge relationships, J. Irrig. Drain. Eng. 139(5), 363–370, 2013); table 5-7 (Cd of an α = 12° quarter-round labyrinth, normal orientation).
Problem
Discharge coefficient Cd of a trapezoidal labyrinth weir with sidewall angle α = 12° and a quarter-round crest, at HT/P = 0.2, 0.4 and 0.6, from the Crookston curve-fit Cd = A·x^(B·x^C) + D.
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). Leave the units on SI (the ribbon's units menu reads “SI Units”, metres and m³/s).
- Click the “Labyrinth” chip at the top of the inputs.
- Type Sidewall angle α = 12°, Cycles N = 9, Crest height P = 4 m, Wall thickness tw = 0.5 m, Inside apex width A = 0.5 m, Apron length B = 22.35 m, and click “Quarter-round” (the geometry of the table 4-6 example; Cd depends only on α and HT/P).
- Type Total head HT = 0.8, 1.6 and 2.4 m in turn (HT / P 0.200, 0.400, 0.600) and read Coefficient Cd: 0.5757, 0.4730, 0.3925.
- Checked by tests/verify/weirs-07-labyrinth-crookston-t5-7.script.
Printed in the table to three decimals.
Labyrinth Cd at non-tabulated angles, Crookston (2010) table 4-8
Crookston, B.M., Labyrinth Weirs, Ph.D. dissertation, Utah State University, Logan, 2010 (chapter 4 published as Crookston, B.M. and Tullis, B.P., Hydraulic design and analysis of labyrinth weirs. I: Discharge relationships, J. Irrig. Drain. Eng. 139(5), 363–370, 2013); table 4-8, column “Cd T. 4-6” (method-predicted Cd for prototype labyrinth weirs).
Problem
For prototype labyrinths (Townsend, Dungo, Standley Lake, São Domingos, Gema, Ute, Avon) whose sidewall angles lie between the tabulated 6°…35°, Crookston lists the Cd his method predicts, interpolating the curve-fit coefficients linearly in α. This checks Flume's interpolation in α.
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). Leave the units on SI (the ribbon's units menu reads “SI Units”, metres and m³/s).
- Click the “Labyrinth” chip at the top of the inputs.
- Type Cycles N = 9, Crest height P = 1 m, Wall thickness tw = 0.5 m, Inside apex width A = 0.5 m, Apron length B = 22.35 m, and click “Quarter-round”. (With P = 1 m the screen warns that w/P is above 4; that doesn't affect Cd, which depends only on α and HT/P.)
- For each case type Sidewall angle α and Total head HT = HT/P in metres, and read Coefficient Cd: 11.4°, 0.208 → 0.5634; 11.4°, 0.554 → 0.3958; 15.2°, 0.2 → 0.6001; 15.2°, 0.4 → 0.5223; 15.2°, 0.6 → 0.4430; 8.51°, 0.648 → 0.2982; 13.3°, 0.4 → 0.4935; 19.0°, 0.2 → 0.6216; 12.15°, 0.147 → 0.5996; 27.5°, 0.932 → 0.4601, with the warning “HT/P = 0.93 is outside the validated range 0.05 to 0.9”.
- Checked by tests/verify/weirs-08-labyrinth-crookston-t4-8.script.
These published values are Crookston's own predictions by the method, not measured prototype coefficients, so they check the implementation and the α-interpolation rather than the method's accuracy. Tolerance ±0.0015; the 27.5° case at HT/P = 0.932 (outside the validated range HT/P < 0.9, where Flume's flow calls warn) differs most, +0.0011.
Labyrinth spillway design example, Crookston (2010) table 4-6
Crookston, B.M., Labyrinth Weirs, Ph.D. dissertation, Utah State University, Logan, 2010 (chapter 4 published as Crookston, B.M. and Tullis, B.P., Hydraulic design and analysis of labyrinth weirs. I: Discharge relationships, J. Irrig. Drain. Eng. 139(5), 363–370, 2013); table 4-6 (design example, computed with g = 9.81 m/s²).
Problem
Design a labyrinth spillway to pass 1,500 m³/s at a total head HT = 2 m with crest height P = 4 m, α = 12°, quarter-round crest, wall thickness 0.5 m, apex width 0.5 m, N = 9 cycles and apron length B = 22.35 m. Find Cd, the crest length Lc, the outside apex width D, cycle width w, total width W and magnification M.
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). Leave the units on SI (the ribbon's units menu reads “SI Units”, metres and m³/s).
- Click the “Labyrinth” chip at the top of the inputs.
- Type Sidewall angle α = 12°, Cycles N = 9, Crest height P = 4 m, Wall thickness tw = 0.5 m, Inside apex width A = 0.5 m, Apron length B = 22.35 m, click “Quarter-round”, and type Total head HT = 2 m.
- Read Discharge Q 1500.1 m³/s, Coefficient Cd 0.4294 (HT / P 0.500), Crest length Lc 418.37 m, Outside apex D 1.310 m, Cycle width w 11.099 m, Total width W 99.887 m, Magnification Lc/W 4.188.
- The required crest length for 1,500 m³/s at HT = 2 m (418.355 m) and the head for 1,500 m³/s (1.9999 m) can't be read: the Labyrinth screen gives the discharge at a head for a given geometry, with no design-discharge input. Both are checked by the engine test; the screen's Q 1500.1 m³/s at 2 m with Lc 418.37 m shows the same agreement.
- Checked by tests/verify/weirs-09-labyrinth-crookston-t4-6.script.
Typo in the source: table 4-6 prints the sidewall length lc as “2.33”; the right value (consistent with Lc and the other dimensions) is 22.33 m. It is not a tested quantity.
Flume uses its own g (9.80665) where the example uses 9.81; the effect is about 0.02% on Lc.
On screen: the crest length from the geometry shows 418.37 m (418.375 rounded to five figures) and the discharge 1500.1 m³/s. The required crest length for 1,500 m³/s and the head for 1,500 m³/s are engine-only: the Labyrinth screen has no design-discharge input.
Straight drop structure (SAF basin), HEC-14 §11.1 design example, SI
Thompson, P.L. and Kilgore, R.T., Hydraulic Design of Energy Dissipators for Culverts and Channels, Hydraulic Engineering Circular No. 14 (HEC-14), 3rd ed., FHWA-NHI-06-086, Federal Highway Administration, July 2006; chapter 11, §11.1 straight drop structure, design example (SI); page to be confirmed.
Problem
A straight drop in a trapezoidal channel (bottom width 3.10 m, 1V:3H sides, S = 0.002, n = 0.030) carries 7.1 m³/s over a crest 3.10 m wide with a drop of 1.83 m. Find the normal (tailwater) depth, critical depth, required tailwater, the floor level, the nappe trajectory lengths, the basin length, the block and sill heights, the wall height and the armour length upstream.
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). Leave the units on SI (the ribbon's units menu reads “SI Units”, metres and m³/s).
- Click the “Drop” chip at the top of the inputs.
- Type Discharge Q = 7.1 m³/s, Crest width Wo = 3.10 m, Drop h = 1.83 m. Under Tailwater pick “Depth” and type Tailwater depth yo = 1.025 m.
- Read under SAF basin (HEC-14): Critical depth yc 0.8118 m; Tailwater needed y3 = 2.15yc 1.745 m; Tailwater below the crest 0.8050 m (h2 = −0.805 m); Floor below the crest ho 2.550 m (ho = −2.55 m); Floor below the channel bed 0.7203 m; Nappe to the floor Lf 3.009 m; Nappe at the tailwater Lt 1.897 m; Nappe at the surface Ls 3.296 m; To the nappe L1 3.152 m; Basin length LB 5.222 m; Block height 0.6494 m; End sill height 0.3247 m; Walls above the tailwater 0.6900 m; Armour upstream 2.435 m.
- For the normal depth pick “Channel normal depth” and type Bottom width b = 3.10 m, Side slope z = 3 H:1V, Manning's n = 0.030, Bed slope S₀ = 0.002 m/m. Read Tailwater depth yo 1.021 m. (The basin rows then use 1.021 m and change in the third decimal; the values above are with the published 1.025 m.)
- Checked by tests/verify/weirs-10-drop-hec14-si.script.
All values printed in the example. The basin is computed with the published yo = 1.025 m; Flume's own normal depth is 1.0211 m (−0.004 m), which is checked separately.
h2 and ho are given here negative below the crest (Flume's sign convention); the example writes them as elevations relative to the crest. The screen shows them as positive distances, “Tailwater below the crest” 0.8050 m and “Floor below the crest ho” 2.550 m.
Straight drop structure (SAF basin), HEC-14 §11.1 design example, CU
Thompson, P.L. and Kilgore, R.T., Hydraulic Design of Energy Dissipators for Culverts and Channels, Hydraulic Engineering Circular No. 14 (HEC-14), 3rd ed., FHWA-NHI-06-086, Federal Highway Administration, July 2006; chapter 11, §11.1 straight drop structure, design example (customary units); page to be confirmed.
Problem
The same design in customary units: 250 ft³/s over a 10 ft crest with a 6 ft drop, trapezoidal channel b = 10 ft, 1V:3H, S = 0.002, n = 0.030, normal depth 3.36 ft.
Results
Reproduce in Flume
- Choose View ▸ Structures (Pro). In the ribbon's Units group open the units menu (“SI Units”) and choose “US customary: feet, ft³/s”. Changing units converts what is in the fields; the values below are typed in afterwards.
- Click the “Drop” chip at the top of the inputs.
- Type Discharge Q = 250 ft³/s, Crest width Wo = 10 ft, Drop h = 6 ft. Under Tailwater pick “Depth” and type Tailwater depth yo = 3.36 ft.
- Read Critical depth yc 2.688 ft, Tailwater needed y3 = 2.15yc 5.780 ft, Floor below the crest ho 8.420 ft (ho = −8.42 ft), Nappe to the floor Lf 9.952 ft, Nappe at the tailwater Lt 6.263 ft, Nappe at the surface Ls 10.906 ft, Basin length LB 17.284 ft.
- Pick “Channel normal depth” and type Bottom width b = 10 ft, Side slope z = 3 H:1V, Manning's n = 0.030, Bed slope S₀ = 0.002 ft/ft. Read Tailwater depth yo 3.362 ft.
- Checked by tests/verify/weirs-11-drop-hec14-cu.script.
The CU example uses rounded inputs (250 ft³/s, 10 ft, 6 ft) rather than exact conversions of the SI ones, so its answers differ slightly from the SI answers converted (e.g. y3 5.77 ft vs 1.745 m = 5.725 ft); each version is checked against its own printed numbers. Not every SI quantity is checked in CU (h2, depression, L1, blocks, sill, walls, armour).
On screen: y3 shows 5.780 ft and ho 8.420 ft below the crest (the Flume column's 5.7796 and −8.4196, rounded); the other values are the Flume column rounded.
Other checks (not from a publication)
- Ogee SI = US: Example 1 at the design head in metres gives 56.5499 m³/s, equal to the US result converted.
- Ogee: a zero design head gives a problem message, not a crash.
- V-notch head for 2.5 ft³/s, back to discharge: 2.5000 ft³/s; V-notch SI = US (60°, 0.3 m): 0.0391 m³/s both ways.
- SI weir coefficients of WMM ch. 7: Francis 1.8384 (WMM 1.84) and Cipolletti 1.8589 (WMM 1.86) m^½/s, within ±0.005.
- Broad-crested weir with Cd = 1 and no approach velocity: C = (2/3)·√(2g/3) = 3.0876 ft^½/s, the 3.087 quoted in DSD §9.12(a) as the theoretical coefficient. At that discharge the crest depth is critical, yc = 2H/3 (1.0000 ft at H = 1.5 ft).
- Broad-crested, round-nosed (b 4 m, L 2 m, P 0.6 m, h 0.5 m): the total head includes V²/2g of the approach (0.5153 m), Cd = 0.93 + 0.10·H/L = 0.9558 is applied, and the depth for the computed discharge returns 0.5000 m. These check consistency only; the coefficients themselves are not verified (see Limits).
- Labyrinth SI = US: the design example in feet gives 1500.0694 m³/s after conversion vs 1500.0705 m³/s.
- Rand drop relations (HEC-14 eq. 11.3) at Nd = 0.05, h = 1 ft: drop number 0.0500, L1 = 4.30·Nd^0.27 = 1.9151 ft, pool depth Nd^0.22 = 0.5173 ft; y3 = 0.7393 ft vs the jump sequent depth of y2 0.7413 ft (−0.3%, Rand's relations hang together to ~1%); a low tailwater is reported as moving the jump downstream.
- Bridge, no piers, no friction, no length: energy and momentum give y3 = y2 = 2.0000 m (subcritical) and y2 = y3 = 0.5000 m (supercritical).
- Bridge in uniform flow with the bed at the friction slope: depth unchanged (2.0000 m) and energy loss = L·Sf = 0.0127 m.
- Yarnell afflux on the inputs of Subramanya's bridge example (106 m rectangular river, six 2.5 m semicircular piers, Q 500 m³/s, y 2.5 m): HEC-RAS form equals the textbook form K·Fr²(K + 5Fr² − 0.6)(α + 15α⁴)·y, 0.0495 m; class A. The book's printed afflux (5.41 cm) is not used: it has an arithmetic slip (its own numbers give about 5.7 cm with α = 0.161), and Flume's α (pier area / channel area at section 2) is 0.1415.
- Same case by the three methods: energy 0.0987 m, momentum 0.0517 m, Yarnell 0.0495 m, all within a factor of 2 of each other (a loose sanity check; the energy method is about twice the others).
- Heavy piers (four 2.5 m piers in a 20 m channel, 60 m³/s): class B, critical depth in the 10 m opening 1.5426 m = (q²/g)^⅓, and the upstream energy above the bridge's critical energy.
- Bridge SI = US (momentum, Subramanya case): 0.0517 m both ways; piers wider than the channel give a problem message.
Limits and open points for review
- Bridges: no published numerical worked example was found, so the energy, momentum and Yarnell methods (HEC-RAS Hydraulic Reference Manual 5.0, ch. 5) are covered by hand checks only. The Subramanya example is used for its inputs, not its printed answer. A published case (e.g. a HEC-RAS manual example or a textbook energy/momentum example) should be added before the bridge results are relied on.
- Bridges are prismatic simplifications: one section for 2, BD, BU and 3; full-depth rectangular piers; no abutment or deck blockage (low flow only, no pressure or weir flow); supercritical class B is not handled; WSPRO is not implemented.
- Broad-crested weir coefficients (round-nosed Cd = 0.93 + 0.10·H/L, square-edged 0.848) were taken from Bos, M.G. (ed.), Discharge Measurement Structures, 3rd rev. ed., ILRI Publication 20, Wageningen, 1989, from memory; the book was not consulted to confirm the formulas, their ranges of H/L, or whether the square-edged value applies to Flume's geometry. Please check them in Bos before use. There is no published worked example for the broad-crested weir; the user can override the coefficient. Submergence (modular limit) is not modelled.
- Ogee: figs. 9-23 to 9-28 digitized from the scanned DSD (≈ ±0.01 on C0, its C0 about 0.008 low); fig. 9-26 not digitized, so with apron and tailwater effects both present the ratios of figs. 9-27 and 9-28 are multiplied (with a warning); this is why Example 2's C is 1% low. Table 9-2's He/H0 = 1.2 row uses C/C0 = 1.03 where the curve reads 1.023. Gated crests are not included.
- V-notch: the 40° kh printed by Bengtson (0.0051 ft) disagrees with his own equation and WMM fig. 7-6a (0.0055 ft), and the latter is used. Partially contracted 90° notches are not covered.
- Kindsvater–Carter: kb read off the small WMM fig. 7-4. Bengtson's Q9 spreadsheet is about 1% above his own formula in cases i–iv; tolerance widened to ±1.5% (case i at −1.41%).
- Labyrinth: only Crookston & Tullis; validated for 0.05 ≤ HT/P < 0.9 (the table 4-8 case at 0.932 is outside it); no submergence; table 4-8 values are the method's predictions, not measured data. Table 4-6 prints lc = 2.33 for 22.33 m.
- Drops: SAF basin limits ho < 4.6 m (15 ft), 1 ≤ ho/yc ≤ 15; the box inlet drop (HEC-14 §11.2) is not included. Rand's relations are only hand-checked.
- Bengtson's course year/edition and the page numbers in DSD, HEC-14 and Crookston were not confirmed in this round.
- Every problem above is reproduced on the Spillway, Weir, Labyrinth and Drop screens (tests/verify/weirs-*.script), except a few engine-only rows: the Francis weirs (the Weir tool has no Francis kind), the ogee head for a discharge and the total head from a depth, and the labyrinth's required crest length and head for a discharge (no such solves on the screens).
Cross-section importers (survey/)Flume Pro
Reads river cross sections from survey and model files into one plain section (stations, elevations, Manning's n breaks, bank stations, reach lengths, coefficients) with warnings: plain station–elevation tables, field books (chainage/offset/elevation), total station point files cut along a section line or an alignment, GNSS/GPS positions projected to UTM or a local tangent plane, LandXML 1.2 cross sections and HEC-RAS geometry files (.g01). The projection formulas are checked against published worked examples; the HEC-RAS reader is checked against example geometry files distributed with HEC-RAS, where the expected values are simply what the files say.
Transverse Mercator on the Clarke 1866 ellipsoid, Snyder USGS PP 1395 numerical example
John P. Snyder, Map Projections — A Working Manual, U.S. Geological Survey Professional Paper 1395, U.S. Government Printing Office, Washington, 1987; Appendix A (numerical examples), transverse Mercator, ellipsoid, forward equations, pp. 269–270 (formulas pp. 60–64). Online: https://pubs.usgs.gov/publication/pp1395
Problem
Find the transverse Mercator rectangular coordinates and the point scale factor of a point at latitude 40°30′ N, longitude 73°30′ W on the Clarke 1866 ellipsoid, for the UTM zone 18 grid (central meridian 75° W, scale on the central meridian 0.9996, origin on the equator). Snyder gives x and y before the 500 000 m UTM false easting is added.
Results
Reproduce in Flume
- Can't be entered in the app: the River tab's Import… sheet projects GNSS positions on WGS 84 only (Projection: UTM with the zone found from the position, or Local plane); there is no ellipsoid or grid choice, so Snyder's Clarke 1866 example is reachable only through the internal functions
survey.projectTransverseMercator (grid: Clarke 1866, λ₀ = −75°, k₀ = 0.9996, false easting 0) and survey.toUtm(…, ellipsoid: clarke1866), which the test calls. No script.
Published values are printed in Snyder's worked example (rounded to 0.1 m and 7 decimals of k). Flume uses Krüger's series to n⁶ (Karney 2011), which is accurate to well under a millimetre; Snyder's example uses his truncated series (eqs. 8-9 to 8-10), so differences of a few centimetres are expected and are inside the 0.1 m rounding of the printed values. The reviewer should confirm the page numbers (269–270) and the printed x, y, k in the book: they were taken from the test's comments and could not be confirmed online while writing this section.
Ordnance Survey National Grid, latitude/longitude to eastings/northings worked example
Ordnance Survey, A Guide to Coordinate Systems in Great Britain, Ordnance Survey, Southampton (current online edition, docs.os.uk); Annex C, “Converting between grid eastings and northings and ellipsoidal latitude and longitude”, worked example (C.1, latitude/longitude to E, N). Online: https://docs.os.uk/more-than-maps/a-guide-to-coordinate-systems-in-great-britain
Problem
Convert a point at latitude 52°39′27.2531″ N, longitude 1°43′4.5177″ E on the Airy 1830 ellipsoid to National Grid eastings and northings. The National Grid is a transverse Mercator projection with true origin 49° N, 2° W, scale on the central meridian F₀ = 0.9996012717 and false origin E₀ = 400 000 m, N₀ = −100 000 m.
Results
Reproduce in Flume
- Can't be entered in the app: the Import… sheet has no National Grid / Airy 1830 option (GNSS positions go to WGS 84 UTM or a local plane only). The test calls the internal function
survey.projectTransverseMercator with a grid of Airy 1830, origin latitude 49, central meridian −2, scale 0.9996012717, false easting 400 000, false northing −100 000. No script.
Published values are printed in the OS guide's worked example (to 1 mm). Flume's latitude/longitude are converted from the degrees–minutes–seconds given. This example checks the transverse Mercator with a non-zero latitude of origin and a false northing, which UTM does not exercise.
HEC-RAS geometry: Beaver Creek single bridge, HEC-RAS Applications Guide Example 2 (beavcrek.g01)
U.S. Army Corps of Engineers, Hydrologic Engineering Center, HEC-RAS River Analysis System, Applications Guide, Example 2 “Single Bridge” (Beaver Creek, Kentwood reach; Highway 1049 bridge); geometry file beavcrek.g01 as distributed with HEC-RAS in the “Steady Examples” example projects, https://www.hec.usace.army.mil/software/hec-ras/. File header: “Geom Title=Beaver Cr. + Bridge - P/W”, “Program Version=4.00”.
Problem
Read the geometry file of the example: one river (Beaver Creek), one reach (Kentwood), 14 cross sections from RS 5.99 (upstream boundary) down to RS 5.0, interpolated sections marked with an asterisk (5.875*, 5.685*, 5.525*, 5.21*, 5.065*), and a bridge (node type 3) at RS 5.4 between RS 5.41 and 5.39. English units (feet); the .g01 itself does not state units. Expected values are what the file says. Excerpt of the first section (RS 5.99):
River Reach=Beaver Creek ,Kentwood
…
Type RM Length L Ch R = 1 ,5.99 ,440,600,400
BEGIN DESCRIPTION:
Upstream Boundary Cross Section
END DESCRIPTION:
…
#Sta/Elev= 35
0 221 7 220.3 36 216.6 131 216.6 233 216.8
282 216.6 351 216.4 518 216.1 591 213.3 627 213.2
692 209 709 212.7 719 209.4 738 204.9 751 210.8
…
1772 218.1 1791 218.4 1831 218.9 1887 220.4 1910 220.8
#Mann= 4 , 1 , 0
0 .1 0 518 .14 0 866 .04 0
948 .14 0
Levee=-1,866,214.8,0,,,0,0
Bank Sta=866,948
XS Rating Curve= 0 ,0
Exp/Cntr=0.3,0.1
…
Type RM Length L Ch R = 1 ,5.41 ,100,100,100
…
#Sta/Elev= 66
…
Exp/Cntr=0.5,0.3
Type RM Length L Ch R = 3 ,5.4 ,,,
…
Node Name=Highway 1049
Results
Reproduce in Flume
- View → River (Pro); on the ribbon, Units: “SI Units” → “US customary: feet, ft³/s”.
- Sections page → Import… → open
tests/survey/beavcrek.g01. The sheet “Import cross sections” shows the heading “HEC-RAS GEOMETRY” and the note “No HEC-RAS project file (.prj) with the units was found next to it: choose the units the file is in.”; under “Units of the file” pick Feet (already selected when the document is in US units).
- Under “What it gives” the sheet reads “14 cross sections, upstream first: RS 5.99, RS 5.875, RS 5.76, RS 5.685, RS 5.61, RS 5.525, RS 5.44, RS 5.41 …”, and the warnings “Beaver Creek Kentwood RS 5.4: bridge skipped (only cross sections are imported)”, “Beaver Creek Kentwood RS 5.99: levees not imported” (also 5.76, 5.29, 5.21, 5.13, 5.065, 5.0) and “… RS 5.41: ineffective flow areas not imported” (also 5.39). River and reach are read from the warnings (“Beaver Creek Kentwood”).
- Click Import. The status line reads “Imported 14 cross sections from beavcrek.g01.” and the list “Cross sections, upstream first” shows RS 5.99 “Upstream Boundary Cross Section”, RS 5.875 … RS 5.41 (8th) “Upstream of bridge embankment”, RS 5.39 (9th) “Downstream of bridge embankment” … RS 5.0 “Downstream Boundary Cross Section”.
- RS 5.99 is selected: Left bank station 866 ft, Right bank station 948 ft; Manning's n on “n breaks”: From station 0 → 0.1, 518 → 0.14, 866 → 0.04, 948 → 0.14; “Reach to the next section”: Left overbank length 440, Channel length 600, Right overbank length 400 ft; Contraction coefficient 0.1, Expansion coefficient 0.3; Ground points: 35 rows, the 14th 738 / 204.9, the last 1910 / 220.8.
- Click RS 5.41: 66 ground point rows, Contraction 0.3, Expansion 0.5. Click RS 5.39: 6 n breaks (0, 89, 450, 647, 824, 1309). Click RS 5.0: the heading reads “Reach below (last section: none needed)” and the three lengths are blank (0 in the file).
- Checked by tests/verify/survey-01-beavcrek.script.
Expected values are read directly from the distributed file (fixed-width 8-character fields, 10 to a line for #Sta/Elev, 9 for #Mann). This checks reading, not hydraulics. The second number on the “#Mann=” line (here 1) is a HEC-RAS flag that Flume ignores; triplets are read as (station, n, 0). Levees, ineffective flow areas and the bridge are not imported, so a run in Flume on this geometry will not match the HEC-RAS bridge results of the Applications Guide. On screen: the geometry title (“Beaver Cr. + Bridge - P/W”) and the “interpolated” mark are read but not shown — the asterisk is dropped from the name (RS 5.875, not 5.875*); river and reach appear only in the warnings (“Beaver Creek Kentwood RS …”); point counts are the number of rows under Ground points; RS 5.0's lengths of 0 are shown as blank fields under “Reach below (last section: none needed)”. If the document is left in SI units, Metres is preselected as the file's units (no .prj): choose Feet, and the sections are converted to metres (e.g. bank 866 ft shows as 263.9568 m).
HEC-RAS geometry: Fall River and Butte Cr. junction, HEC-RAS User's Manual Chapter 4 example (ex1.g01)
U.S. Army Corps of Engineers, Hydrologic Engineering Center, HEC-RAS River Analysis System, User's Manual, Chapter 4 “Example Application” (steady flow, Fall River with Butte Cr. joining at the Sutter junction); geometry file ex1.g01 as distributed with HEC-RAS example projects, https://www.hec.usace.army.mil/software/hec-ras/. File header: “Geom Title=Base Geometry Data”, “Program Version=4.00”.
Problem
Read a geometry with three reaches meeting at a junction: Butte Cr. / Tributary (RS 0.2, 0.1, 0.0), Fall River / Upper Reach (RS 10, 9.9, 9.8), Fall River / Lower Reach (RS 9.79, 9.7, 9.6, 9.5); 8 station–elevation points per section; English units. Excerpt:
Geom Title=Base Geometry Data
Program Version=4.00
…
Junct Name=Sutter
Junct Desc=Flow Confluence of Fall and Butte Creek, 0 , 0 ,-1
…
River Reach=Butte Cr. ,Tributary
…
Type RM Length L Ch R = 1 ,0.2 ,500,500,500
…
River Reach=Fall River ,Upper Reach
…
Type RM Length L Ch R = 1 ,10 ,450,500,550
…
#Sta/Elev= 8
…
#Mann= 3 , 0 , 0
…
Bank Sta=200,240
…
Exp/Cntr=0.3,0.1
…
River Reach=Fall River ,Lower Reach
Results
Reproduce in Flume
- View → River (Pro); Units → “US customary: feet, ft³/s”.
- Import… → open
tests/survey/ex1.g01; Units of the file: Feet. A “Reach” menu lists “Butte Cr. / Tributary”, “Fall River / Upper Reach”, “Fall River / Lower Reach”; with the first, the sheet reads “3 cross sections, upstream first: RS 0.2, RS 0.1, RS 0.0” and “Only Butte Cr. / Tributary is imported: the file has 3 reaches, and Flume works one reach at a time”.
- Pick “Fall River / Upper Reach”: “3 cross sections, upstream first: RS 10, RS 9.9, RS 9.8”. Click Import; RS 10 (“Upstream Boundary of Fall River”) is selected: Left overbank length 450, Channel length 500, Right overbank length 550 ft.
- Import… again, same file, pick “Fall River / Lower Reach”: “4 cross sections, upstream first: RS 9.79, RS 9.7, RS 9.6, RS 9.5”; Import → “Imported 4 cross sections from ex1.g01.”
- Checked by tests/verify/survey-02-ex1.script.
Expected values are what the file says (section counts per river/reach, the RS 10 “Type RM Length L Ch R” line). The junction itself (Sutter, junction lengths) is not imported; Flume only keeps each section's river and reach names. On screen the 10 sections are never shown together: the River tab works one reach at a time, so the Import… sheet has a Reach menu and gives 3, 3 and 4 sections for the three reaches (each import replaces the sections already there unless “Add to the sections already there” is on).
HEC-RAS geometry, old (HEC-RAS 2 era) format: Mixed Flow example, first sections (mixed.g01)
U.S. Army Corps of Engineers, Hydrologic Engineering Center, HEC-RAS “Mixed Flow” example project, geometry file in the old format (“Reach=” instead of “River Reach=”, blank fields), as distributed with HEC-RAS example projects, https://www.hec.usace.army.mil/software/hec-ras/; the fixture holds two of its cross sections. File header: “Geom Title=Mixed Flow Geometry Data”.
Problem
Read two sections of a rectangular channel 20 ft wide with vertical walls, from a file in the older layout: reach given as “Reach=Mixed Reach”, blank left/right reach lengths, “Node Desc=” descriptions, blank fields inside the #Mann block. The whole fixture:
Geom Title=Mixed Flow Geometry Data
…
Reach=Mixed Reach
…
Type RM Length L Ch R =1,0.5682 ,,100,,0,0,0
Node Desc=Ninetenth Cross Section
#Sta/Elev= 4
0 80 0 70 20 70 20 80
#Mann=3,0
0 0 0 .015 0 20 0
Bank Sta=0,20
Exp/Cntr=0.3,0.1
Type RM Length L Ch R =1,0.5493 ,,100,,0,0,0
Node Desc=Eighteenth Cross Section
#Sta/Elev= 4
0 79 0 69 20 69 20 79
#Mann=3,0
0 0 0 0 .015 0 20 0 0
Bank Sta=0,20
Exp/Cntr=0.3,0.1
Results
Reproduce in Flume
- View → River (Pro); Units → “US customary: feet, ft³/s”.
- Import… → open
tests/survey/mixed.g01; Units of the file: Feet. The sheet reads “2 cross sections, upstream first: RS 0.5682, RS 0.5493” with no warnings.
- Click Import: “Imported 2 cross sections from mixed.g01.”, list RS 0.5682 “Ninetenth Cross Section”, RS 0.5493 “Eighteenth Cross Section”.
- RS 0.5682 is selected: Left bank station 0, Right bank station 20 ft; Manning's n shown as “Overbanks + channel”: Left overbank n 0, Channel n 0.015, Right overbank n 0; Left overbank length 0, Channel length 100, Right overbank length 0 ft; Contraction 0.1, Expansion 0.3; ground points 0 / 80, 0 / 70, 20 / 70, 20 / 80 in that order.
- Click RS 0.5493: ground points 0 / 79, 0 / 69, 20 / 69, 20 / 79; Expansion coefficient 0.3.
- Checked by tests/verify/survey-03-mixed.script.
Expected values are what the file says. Doubtful points for the reviewer: (1) the fixture is described as two sections taken from the HEC-RAS Mixed Flow example, but their descriptions (“Ninetenth”, “Eighteenth”) suggest they are not the first two of the original file, and it could not be checked whether the blank fields are original or were made for the test; (2) the check named “default expansion when missing” reads RS 0.5493, which does have “Exp/Cntr=0.3,0.1” in the file, so the default for a missing Exp/Cntr line is not actually exercised. On screen the three n breaks (0 → 0, 0 → 0.015, 20 → 0) fall exactly on the first point and the banks, so the section shows them in the “Overbanks + channel” form: Left overbank n 0, Channel n 0.015, Right overbank n 0.
Other checks (not from a publication)
The fixtures below were written for the tests (made-up but realistic survey data); the values checked are the numbers in each file or exact by construction. All checks pass (166 in total, test output “all survey checks passed”).
- plain.csv — one section with a header and an optional n column (n applies from that row on, blank = same).
# Banaba Creek, XS-3, surveyed 2026-09-14 (stations in m from left pin, elevations in m)
Station,Elevation,n
0.00,104.82,0.045
6.50,103.95,
…
15.30,100.85,0.035
…
20.40,99.48,
…
25.60,100.96,0.045
…
42.00,104.71,
Flume reads 11 points, last station 42.0, thalweg 99.48, 3 n breaks (second at 15.3), n 0.035 at station 20.4 and 0.045 at 30.0, no warnings; as a hydraulic section it is valid and the point at 17.8 carries n 0.035. In the app (View → River (Pro), SI; Import… → tests/survey/plain.csv; The file holds: Table; Units of the file: Metres; Import): “Imported 1 cross section from plain.csv.”, no warnings; RS plain has 11 ground point rows, 0 / 104.82 … 20.4 / 99.48 … 42 / 104.71; n breaks From station 0 → 0.045, 15.3 → 0.035, 25.6 → 0.045. Checked by tests/verify/survey-04-tables.script.
- plain_spaces.txt — space separated, no header, one bad line, one station out of order.
0 12.40
4.5 11.20
9.0 10.05
13.5 9.60
11.0 9.85
…
pin lost
26.0 12.55
Flume reads 8 points (the “pin lost” line, line 8, skipped and reported), warns that stations were not sorted, sorts them (4th station 11.0), and has no n values. In the app (Import… → tests/survey/plain_spaces.txt, Table, Metres, Import): warnings “line 8: skipped, not a station and elevation: pin lost”, “section plain_spaces: stations weren't in increasing order; points were sorted by station” and “RS plain_spaces: no n in the file; n = 0.035 is used until you change it”; 8 ground points, the 4th 11 / 9.85; n 0.035 in all three fields. Checked by tests/verify/survey-04-tables.script.
- trapezoid.csv — semicolon separated, bottom 4, side slopes 1:1 (hand check).
station;elevation
0;2
2;0
6;0
8;2
At depth 1 m Flume gives A = 5.0000 m², T = 6.0000 m, P = 6.8284 m (= 4 + 2√2), exactly the hand values. An empty file (header only) is reported as a problem, not a crash. In the app (Import… → tests/survey/trapezoid.csv, Table, Metres, Import): ground points 0 / 2, 2 / 0, 6 / 0, 8 / 2 and the “no n” warning; A, T and P at a given depth are not shown anywhere on the River tab (it shows profile results only), so the hand check stays engine-only. Checked by tests/verify/survey-04-tables.script.
- fieldbook.csv — chainage, offset, elevation, code; offsets as L/R, CL, signed numbers, and “15.0L”.
Chainage,Offset,Elevation,Code
0+000,L15.0,52.40,TOP
0+000,L8.2,51.10,LB
0+000,CL,48.75,CL
…
0+020,R13.6,51.92,TOP
0+020,R7.5,50.70,RB
…
0+020,-8.0,50.96,LB
0+020,-14.5,52.28,TOP
0+040,15.0L,52.15,TOP
…
0+040,13.2R,51.80,TOP
Flume reads 3 sections; 0+020 keeps its name, chainage 20.0, points sorted by offset from −14.5 to 13.6, banks −8.0 (LB) and 7.5 (RB); 0+040 starts at −15.0 and has no banks; no warnings. In the app (Import… → tests/survey/fieldbook.csv; The file holds: Field book; Metres; “Chainage grows upstream” off; Import): “3 cross sections, upstream first: RS 40, RS 20, RS 0” — river stations are counted up from the downstream end, so chainage 0+000 is RS 40, 0+020 is RS 20 and 0+040 is RS 0 (descriptions “chainage 0+000” …), with 20 m reach lengths. Click RS 20: Left bank station −8, Right bank station 7.5, ground points from −14.5 to 13.6 (7 rows). Click RS 0: points from −15 (52.15) to 13.2, bank fields blank. The only warnings are “RS …: no n in the file; n = 0.035 is used until you change it”. Checked by tests/verify/survey-05-fieldbook.script.
- Text parsing — chainage “1+250.5” → 1250.5, “12+50” → 1250.0, “0+020” → 20.0; offset “L12.5” → −12.5, “6.6R” → 6.6, “LT 3” → −3.0; angle “40°30'N” → 40.5, “73 30 00 W” → −73.5, “-0:30:36” → −0.51; “40 75 00” rejected (75 minutes). These parse internal text and can't be checked on their own in the app (the field book import above reads “0+020” as chainage 20).
- points_pnezd.csv — total station points (no header) laid out on the line from E 1000, N 2000 to E 1030, N 2040 (50 m on a 3-4-5 bearing), so each station is exact; point 109 is 6 m off the line, 110 beyond its end.
101,2000.24,999.68,21.50,TOP
102,2006.1,1005.2,20.10,LB
…
105,2020.6,1014.2,17.48,BED
109,2023.6,1010.2,19.00,TREE
…
110,2044.0,1033.0,22.00,FENCE
Flume reads 10 points, assumes PNEZD and says so, easting of 102 = 1005.2. Cut with a 2 m band: 8 points used, stations 0, 8, 15, 20, 25, 31, 38, 50 (largest error 0.0000), bed 17.48 at station 25, banks 8.0 (LB) and 38.0 (RB); with a 0.45 m band only 4 points. Cut square to a bent 70 m centreline at chainage 30: same stations, river station 30; chainage 80 (off the alignment) is reported. Points walked in order: span 50.0016 m = √(30.32² + 39.76²). In the app (Import… → tests/survey/points_pnezd.csv; The file holds: Points; Metres): warning “no header line: columns taken as point, northing, easting, elevation, description (PNEZD)”, “Points (10, m)” with 102's easting 1005.200. “Sections from the points”: Section lines, type 1000 2000 1030 2040 XS-A in “E1 N1 E2 N2 (one section a line)”, “Band each side” 0.45 → Import: RS XS-A “XS-A, 4 points” (stations 0, 15, 31, 50; warning “a point 0.4 off the line was used; check the band width”). Again with the band left at 2: “XS-A, 8 points”, stations 0, 8, 15, 20, 25, 31, 38, 50, 17.48 at 25, Left bank station 8, Right bank station 38. Alignment: vertices 1039 2002, 1031 2008, 983 2044 (one a line), chainage 80, widths 5 and 5, band 1 → the sheet shows “Chainage 80 is off the alignment (0 to 70)” and Import is disabled; chainage 30, widths 25 and 25, band 2 → Import: “chainage 30, 8 points”, the same stations and banks. A single cut section is renumbered RS 0 (river stations count up from the downstream end), so the river station 30 of the test is seen only in the description. Walked: the app walks all 10 points of the file in their order (not the test's five), giving 10 rows ending 50.0016 / 21.7 (point 108) and 55.0015 / 22 (110), banks 8.0063 and 37.9975. Checked by tests/verify/survey-06-points.script.
- points_penzd.txt — whitespace file with a header and descriptions containing spaces.
PT EASTING NORTHING ELEV DESCRIPTION
1 285412.318 1668204.775 31.042 TOP OF BANK
…
3 285419.511 1668209.552 28.415 CHANNEL BED
Flume takes PENZD from the header, northing of point 3 = 1 668 209.552, description “TOP OF BANK”, no warnings. In the app (Import… → tests/survey/points_penzd.txt, Points, Metres, Column order “From the file”): the point list shows point 3 at easting 285419.511, northing 1668209.552, code “CHANNEL BED”, point 1 “TOP OF BANK”; the only warning is the “no n” one. Checked by tests/verify/survey-07-pointfiles.script.
- points_utm.csv — no header, UTM-sized eastings first (
1,285412.318,1668204.775,31.042,TOB): automatic order reads PENZD (easting 285 412.318); forcing PNEZD is obeyed (northing 285 412.318). In the app (Import… → tests/survey/points_utm.csv, Points, Metres): with “From the file” point 1 shows Easting 285412.318, Northing 1668204.775; click PNEZD and it shows Easting 1668204.775, Northing 285412.318. The sheet also warns “an end point is the lowest point, so the section can't hold water above it” for the walked three points. Checked by tests/verify/survey-07-pointfiles.script.
- gnss.csv — RTK rover positions on WGS 84 across a river, one in DMS.
# RTK rover, WGS 84, walked left bank to right bank across Abacan River
Name,Latitude,Longitude,Ellipsoidal Height,Code
G1,15.1123000,120.7745000,92.214,TOP
G2,15.1123010,120.7745500,90.876,LB
G3,15°06'44.2782"N,120°46'28.560"E,88.341,BED
…
G6,15.1123005,120.7747500,92.390,TOP
Flume reads 6 fixes, flags the heights ellipsoidal, G3 = 15.1122995°, 120.7746°. Projected to UTM: zone 51; with geoid separation 45 m, G1 elevation 47.214 m (h − N). Walked section width 26.8819 m vs ground width × UTM k 26.8818 m (tol 0.005); bank-to-bank 16.1288 vs 16.1291 m (tol 0.01). On the local tangent plane: width 26.8740 vs ground width 26.8735 m (tol 0.005). In US units elevations are international feet (302.5394 ft = 92.214 / 0.3048). In the app (SI; Import… → tests/survey/gnss.csv; The file holds: GNSS; Projection: UTM; Walked): “Points (6, m)”, G1 at 260815.131 / 1671958.446, warnings “Projected to UTM zone 51N” and “The heights are ellipsoidal and the geoid separation is 0: …”; typing 45 in “Geoid separation N” shows G1's elevation 47.214. With N back at 0, Import: RS gnss “6 points walked”, ground points ending at 26.8819, Left bank station 5.3766, Right bank station 21.5054 (16.1288 apart). Import… again with Projection: Local plane: last station 26.874. Units → US customary, Import… again (UTM): G1 elevation 302.5394 ft, last station 88.1951 ft. Checked by tests/verify/survey-08-gnss.script.
- UTM hand checks — equator on the 123° E central meridian: (500 000.0000, 0.0000), k = 0.9996; 124.5° E and 121.5° E at 15° N are symmetric about the meridian (161 277.2661 m each side); 15° S mirrors 15° N about 10 000 000 m. Zones: Manila 51, Bergen 32 (32V exception), Svalbard 15° E 33 (33X), 180° → 60. Internal function checks: the app has no way to enter a single latitude/longitude and read its UTM coordinates other than a GNSS file.
- Local tangent plane hand checks at 15.1123° N, 120.7745° E: 0.0001° north = 11.0650 m = meridian radius M × Δφ; 0.0001° east = 10.7494 m = prime-vertical radius N × cos φ × Δλ (tol 1 mm); 10 m up = 10.0000 m. Internal function checks; the gnss.csv sections above exercise the same projections in the app.
- sections.xml — LandXML 1.2 (element names from the LandXML-1.2 schema, landxml.org), metric, alignment “Banaba Creek CL”, three CrossSects every 25 m, surfaces “EG” and “Design channel”.
<Project name="Banaba Creek Improvement"/>
…
<Alignment name="Banaba Creek CL" length="50.0" staStart="0.0">
…
<CrossSect sta="0.0" name="0+000" desc="upstream end">
<CrossSectSurf name="EG">
<PntList2D>-12.000 24.310 -7.500 23.880 -3.200 22.150 0.000 21.640 …</PntList2D>
</CrossSectSurf>
<DesignCrossSectSurf name="Design channel" side="both">
<CrossSectPnt>-6.000 23.900</CrossSectPnt>
…
<CrossSect sta="25.0" name="0+025">
<CrossSectSurf name="EG">
<PntList2D>-12.000 24.150 -7.100 23.700 -2.900 21.980</PntList2D>
<PntList2D>0.000 21.470 3.100 21.860 8.000 23.770 12.000 24.260</PntList2D>
…
<CrossSect sta="50.0" name="0+050" desc="Bridge & ford">
Flume reads title “Banaba Creek Improvement”, 3 sections, name “0+000”, river “Banaba Creek CL”, 7 EG points, elevation 22.15 at offset −3.2, length 25.0 to the next section; 0+025's two PntList2D pieces joined to 7 points with a “gaps” warning; the list over several lines in 0+050 read (4th elevation 21.3); description “Bridge & ford”; the other surface “Design channel” named in a warning; surface list “EG|Design channel”. With surface “Design channel”: 2 sections, design bottom 21.75 at 0+025, 0+050 reported as lacking it. Text that isn't XML is a problem. In the app (SI; Import… → tests/survey/sections.xml; heading “LandXML”; Surface menu “EG”; “Chainage grows upstream” off): “3 cross sections, upstream first: RS 50, RS 25, RS 0” and the warning “CrossSect 0+025: surface "EG" has gaps; the pieces were joined”. Import: RS 50 “upstream end” (0+000) has 7 points with 22.15 at −3.2 and lengths 25 / 25 / 25 m; RS 25 (0+025) 7 points; RS 0 “Bridge & ford” (0+050), 4th point 0 / 21.3. The test's warning naming the other surface does not appear on screen: the sheet offers the Surface menu instead. Pick “Design channel”: “2 cross sections, upstream first: RS 25, RS 0” and “CrossSect 0+050: no surface named "Design channel"; skipped”; after Import, RS 0 (0+025) has the bottom at 21.75. Checked by tests/verify/survey-09-landxml.script.
- sections_ft.xml — LandXML in US survey feet.
<Imperial … linearUnit="USSurveyFoot" …/>
…
<CrossSect sta="1000.0">
<CrossSectSurf name="Ground"><PntList2D>-50 112.5 -10 104.0 0 100.0 10 104.5 50 113.0</PntList2D></CrossSectSurf>
Into SI: first station −15.2400 m (= −50 × 1200/3937); into US (international) feet: elevation 100.0002 ft and river station 1000.0020 ft (2 ppm difference between survey and international foot). In the app (SI; Import… → tests/survey/sections_ft.xml, Import): one section RS 0, description “chainage 304.801”, first ground point −15.24 / 34.2901 m. In US customary units: description “chainage 1000.002”, points −50.0001 / 112.5002 … 0 / 100.0002 ft. The river station of a lone section is renumbered 0, so 1000.0020 ft is read from the description. Checked by tests/verify/survey-09-landxml.script.
- HEC-RAS helpers — project units read from a .prj (“SI Units” → SI, “English Units” → US); an empty geometry file is a problem; a plain table with n = 0 over ground (station 0) is warned (“Manning's n at station 0 is 0”). Not reproduced in the app: no fixture has a .prj beside it or n = 0 in a table, and an empty geometry file isn't among the fixtures.
Limits and open points for review
- The two projection examples can't be reproduced in the app: GNSS import uses WGS 84 only (UTM with the zone found from the position, or local tangent plane); Clarke 1866, Airy 1830 and custom transverse Mercator grids (e.g. PRS 92 / PTM, National Grid) are reachable only through internal functions. No datum transformation; geoid separation is one constant, not a geoid model; no UTM → latitude/longitude inverse.
- Snyder's page numbers (269–270) and printed x, y, k were taken from the test source and module notes; they could not be confirmed online while writing — please check them in PP 1395.
- The HEC-RAS checks confirm only that the files are read as written; no hydraulic results of the HEC-RAS examples are compared here. Bridges, culverts, inline/lateral structures, levees, ineffective flow areas, blocked obstructions, vertical n variation, junctions and storage areas are skipped or noted, not imported. Only type 1 nodes are read.
- The .g01 file has no units; the user (or the .prj) must say. Plain tables, field books and point files are also read in whatever units the user chooses; only LandXML converts.
- HEC-RAS river stations increase upstream, while LandXML lengths assume the alignment is drawn downstream; the Import… sheet has a “Chainage grows upstream” switch for field books and LandXML, and numbers river stations up from the downstream end.
- mixed.g01: provenance of the excerpt (which sections, whether the blank fields are original) and the “default expansion when missing” check, which does not exercise a missing Exp/Cntr line (see that article's note).
- All fixtures other than the three .g01 files are made up for the tests (not from a publication); their checks are under “Other checks”.